Four components of the cost of one permit
The annual cost of circulating service permits consists of four parts, and it is worth counting them separately, because each has a different owner at the plant. The first is printing the plant's template, the second signatures and the circulation of the document, the third archiving, and the fourth the manual settlement of external company hours from service invoices.
Printing the plant's template
The print template of the permit can reproduce the plant's paper form through an uploaded template matrix. The plant does not have to change a document that controllers and team leaders are used to. The cost of printing is paper, toner and time at the printer, and for permits with an attachment card one additional page is added for each especially dangerous work.
Signatures, carrying, archiving
Signatures are the time of people with the highest hourly rate: the manager, the coordinator, OHS. Archiving is the binder, the place in the archive and searching during an inspection. An electronic permit with a record of statuses and time replaces this chain with a single record.
Settling external company hours
The permit time and the working time of each employee are counted separately, and the employee's time is counted from joining or from the start detected by location. For purchasing this means data for verifying a service invoice without manually retyping hours from paper permits.
Assumptions of the sample calculation
We assume 360 service permits a year, that is on average one a day. Printing is 4 pages at 0.30 PLN, a total of 1.20 PLN per permit. Signatures and circulation take 20 minutes of work in total at a rate of 55 PLN per hour, which gives about 18.33 PLN. Archiving and searching cost 2 PLN per permit. Manual settlement of external company hours takes 25 minutes at the same rate, which is about 22.92 PLN.
All values are sample assumptions. A plant with several thousand permits a year will apply a different scale, and a plant with one service technician a week a different one.
Components of the cost of one service permit
Result: per year and per permit
The total per permit is 1.20 plus 18.33 plus 2.00 plus 22.92, that is 44.45 PLN. With 360 permits a year this gives about 16,000 PLN. The most important conclusion, however, concerns not the amount but the structure: paper and toner are under 3 percent of the cost of a permit, and more than 90 percent is people's time.
This changes the conversation with purchasing. The saving on printing is small, but the time of signatures and of settling hours can be measured and shortened. A plant is therefore not convinced by an argument about paper, but by the question of how many hours a month go into copying hours from permits into settlements with the service company.
What this calculation does not cover
It does not cover the cost of machine downtime during the circulation, which we count separately in the downtime calculation. Nor does it cover the cost of implementing and licensing the system, because that depends on the number of locations, users and the scope of modules, and the quotation is individual. Indicative ranges from 2025-2026 implementations are given only after a conversation about scope.
The calculation also does not assess the evidential value of an electronic record during an inspection or after an accident, although for many plants this is a more important argument than the cost of paper.
Annual cost of circulating service permits on paper
| Parameter | Value |
|---|---|
| Service permits in the year | 360 pcs |
| Printing: 4 pages at 0.30 PLN | 1.20 PLN/permit |
| Signatures and circulation: 20 min at 55 PLN/h | 18.33 PLN/permit |
| Archiving and searching | 2 PLN/permit |
| Settling external company hours: 25 min at 55 PLN/h | 22.92 PLN/permit |
Result: 44.45 PLN per permit; 360 x 44.45 PLN is about 16,000 PLN a year, of which printing is about 430 PLN.
Note: Sample calculation, not referring to any specific plant. The cost of implementing the system is not included; the quotation is individual.
Video
Frequently asked questions
Why is printing such a small part of the cost?
Because paper and toner cost very little compared with the time of the people signing and settling hours. The main savings concern time, not materials.
Is printing still needed after moving to the electronic circulation?
The plant may keep it. The print template reproduces the plant's form, and a permit with a PSZN can carry an attachment card, printed as one PDF.
How do we measure the time spent settling external company hours?
A one-month trial is enough: how many permits had to be copied into the summary and how many minutes each took. The result replaces the 25 minutes in the example.
Let us calculate permit circulation at your plant
We will put your own permit numbers and hourly rates into this calculation and show where the recoverable time lies.
Let's talk