InnerWeb
Skip to main content

Pilot and existing access control, time and HR systems

The InnerWeb pilot does not require replacing access control readers or the time and attendance system, because InnerWeb is an independent system that complements the client's existing systems. Below are answers to the questions from IT and HR teams: what stays unchanged, what must be made available and how to limit the scope of the pilot so it does not become an integration project.

What the pilot does not change at the site

InnerWeb is an independent system that complements the client's existing systems: access control (KD), time and attendance (RCP), the HR system and enterprise resource planning (ERP). For this reason the pilot does not replace them. Readers, cards, terminals and software the site uses today keep working without any intervention.

InnerWeb is a software producer, not a reader manufacturer. The InnerWeb industrial beacon has an industrial design registration, a CE declaration and ATEX certification for zones 2/22, while other hardware is purchased and integrated. InnerWeb does not manufacture or replace access control readers, so the pilot contains no line item for replacing readers. For purchasing and IT this is the essential point: the pilot does not open an infrastructure project on the access control side.

What the IT team must provide

The IT scope depends on the pilot variant. The no-movement pilot is the lightest: the LTE watch has its own SIM card, so it does not require integration with the site network. The watches are managed through an MDM system, and the server with licences for 10 users is provided by the vendor. BLE beacons are powered independently of the site's IT network.

The route-patrol and inspection pilot usually requires three mobile devices running the application, which also works offline, and access to the instance. In both variants IT should name a contact person, agree how users will access the instance and report to the vendor any restrictions of the security policy that apply to mobile devices.

Minimum list for IT

Before the pilot starts, the IT team confirms a few points to avoid delays during installation.

  • A contact person in IT and a deputy.
  • Rules for mobile devices and for the application working offline.
  • The way users access the instance.
  • A decision on whether the pilot touches the access control, time and attendance, HR or ERP systems at all.

What stays unchanged and what is added in the no-movement pilot

What stays unchanged and what is added in the no-movement pilotHorizontal bar chart: 50 BLE beacons, 10 licences, 0 access control readers replaced.01020304050pcsBLE beaconsBLE beacons: 50 pcs50User licencesUser licences: 10 pcs10Access control readersreplacedAccess control readers replaced: 0 pcs0
Source: Card: scope of the no-movement detection pilot

What the HR team must provide

The HR department most often worries about importing personal data. For the pilot a list of a few to a dozen users is enough: employees with administrator, security and health and safety roles, and coordinators from external contractors. Visitors, contractor employees and drivers are not counted for licences. The billing minimum is 10 licences, so the list does not have to be long.

For the no-movement detection, HR and employee representatives should know who wears the watch and for what purpose. This is a conversation about the safety of people working alone, not about time recording. It is worth holding it before installation, not after the first alarm.

Modules that touch external systems

Most modules available from day one under the pilot licence work on their own: deliveries, route patrols, reports, tasks, reporting, permissions and qualifications. Integrations with access control, time and attendance or ERP are not a condition of the pilot and can be discussed after the results are assessed. If the site wants to show them in the pilot, this is agreed separately as an extension.

Two features require care in communication. The voice assistant is a pilot on a single server enabled by a flag and is not available on every installation. The mRCP module is disabled by default. If anyone at the site expects them in the pilot, this must be explained at the start to avoid disappointment.

How localisation works with the existing infrastructure

Localisation in InnerWeb results from signals of many beacons averaged on the map. Inside buildings we recommend one beacon per 100-200 m2, and on site roads roughly every 100 m. The system works without GPS and does not use access control readers to determine a person's position. This is a separate layer: position comes from the BLE network, while access control and time events remain in their own systems.

This allows the pilot to be limited to one hall or one route without changing anything in the existing network. After the pilot the site decides whether it wants to link data from access control, time and attendance or HR, and only then plans integration with the vendors of those systems.

Video

Frequently asked questions

Does the pilot require replacing access control readers?

No. InnerWeb does not manufacture readers and does not replace them. The pilot runs alongside the existing access control system, which stays unchanged.

Does the pilot replace the time and attendance system?

No. InnerWeb is an independent system that complements the client's existing systems. The mRCP module is disabled by default, so it is not part of the standard pilot.

Do LTE watches need access to the site network?

No. The LTE watch has its own SIM card and is managed through MDM, so the no-movement pilot does not require integration with the site network.

What data does HR need to provide?

A list of a few to a dozen users with administrator, security, health and safety and contractor coordinator roles. Visitors, contractor employees and drivers are not counted for licences.

Let's plan a pilot for your site

Book a conversation with InnerWeb: we will help you select the scope, the number of users and the pilot success criteria for your hall or route.

Let's talk