Situation: a chemical plant and the transmitter network decision
The concept applies to a chemical plant with several gates and dozens of deliveries a day. Drivers enter a site they do not visit every day: they do not know the internal roads, the no-entry zones or the parking spots. Security sees a vehicle at the gate but does not know where it is after the first 100 metres.
The purchasing department faces an investment decision: buying and installing a transmitter network, driver locators, charging stations and a subscription. Management asks a fair question: how do we know this works with our traffic and not only in a demo? The answer is a pilot on real delivery traffic that confirms the system works before the production network is bought.
This is an implementation scenario, not a description of a finished installation. The input data are typical for plants of a similar profile and allow the pilot to be planned so that its result can be presented in the decision documentation.
Scope of the pilot: what we check with live traffic
The pilot does not try to show everything. It selects one delivery stream, for example vehicles entering through one gate into one unloading area, and measures what matters for the later purchase decision.
Before the start, the security and logistics team sets four questions the pilot must answer:
- Does the driver receive instructions and reach the correct unloading gate without an escort?
- Does security see the vehicle position on the map and the time spent on site?
- Does the locator return to the charging station after the delivery and become ready for the next driver?
- When a disruption occurs, for example a stop in an unauthorised place, does the dispatcher receive a signal in a time they consider useful?
What the pilot does not cover
The pilot does not replace the systems the plant already has: access control, working time recording, the delivery booking system or the ERP. InnerWeb is an independent system that complements the client's existing systems, so the test does not require replacing or rebuilding them.
Recommended transmitter density by environment
How to set up the pilot step by step
A well-prepared pilot has three phases, and each ends with a measurable result. The order matters, because the result of the first phase determines how the elements are placed in the second.
In the preparation phase the team defines the route from the gate to the unloading area and decides where the driver must stop or turn. Positioning in InnerWeb is based on signals from several transmitters averaged on the map, so transmitters are placed on plant roads roughly every 100 m, and inside buildings the planning value is 1 transmitter per 100-200 m². The system works without GPS, which matters under canopies, elevated structures and buildings with steel frames.
In the live traffic phase, deliveries follow the normal schedule and the locators are handed to drivers at the gate. Nothing is staged: if a week brings a peak in deliveries or a scale failure, the pilot records it. In the summary phase the team compares the times of each stage (entry, transit, unloading, exit) with the earlier observations of security.
- Choose one gate and one unloading area, not the whole road network.
- Set the pilot questions before installation, not after it.
- Plan the collection and charging of the locators in one place, so the logistics of the equipment is tested as well.
- Appoint a person on the plant side who is responsible for the final result.
What the pilot changes in the purchase decision
Without a pilot, the purchase of a production network rests on declarations and assumptions. After the pilot, management has data from its own site: how long a typical delivery takes, where vehicles lose time, how many times a driver left the route and how fast security responded. In the decision documentation this is a stronger argument than a catalogue specification.
The second effect concerns costs. The pilot costs less than a full network, and its devices can be transferred to ownership on a 1:1 basis to avoid a double purchase. The plant therefore does not pay twice for the same equipment if it moves to production. The details of this transition are described on a separate page about moving from the pilot to production.
The third effect is organisational. Drivers, security and logistics go through the process before it becomes an obligation. The team knows which notifications the system generates, who responds to them and which rules need correction before the production launch.
Result: what the pilot outcome looks like
In past InnerWeb projects the transition from pilot to production deployment reached 100%. This indicator is not a promise for a given plant, but it shows that in this model the pilot serves to confirm a decision, not to postpone it.
The result of a delivery pilot is usually a document of a few pages: a list of measured indicators, a description of three or four events that best show how the system works, and a list of things to improve before production. Such a report is read by the logistics manager, the head of security and the purchasing department, so it must use language understandable to each of them.
If the result is negative, for example routes turn out too long for the planned transmitter spacing, that is also a useful conclusion. The plant loses the small cost of the pilot, not the cost of the entire network.
Conclusions for a plant that receives deliveries
A pilot on live traffic makes sense when the plant can name one delivery stream, measure it before and after installation and record the conclusion in a form useful for management. The number of devices installed matters less than whether the team knows, at the end, what to do next.
The most common mistake is a pilot without questions. The plant installs equipment, observes for several weeks and then cannot say whether the result is good. That is why the pilot questions and the evaluation criteria are written down before the first day.
Video
Frequently asked questions
Does a pilot require buying the full transmitter network?
No. The pilot covers a selected part of the traffic, and the production network is bought after the results are assessed. This way the investment decision rests on data from the plant's own site.
Does driver location require GPS?
No. The position comes from signals of several transmitters averaged on the map, so the system also works where GPS is disturbed, for example under canopies or in metal buildings.
What happens to the equipment after the pilot?
Devices used in the pilot can be transferred to ownership on a 1:1 basis to avoid a double purchase. The conditions are set in the contract.
Does the pilot replace a gate booking or access control system?
No. InnerWeb is an independent system that complements the plant's existing systems and does not require replacing them during the pilot.