What makes up the cost of the parallel run
The first component is the time of people who enter the same thing twice: on the paper form and in the system. The second is the time of compliance checks, meaning comparing entries from both sources. The third is infrastructure and licence cost, which depends on the contract.
At InnerWeb a pilot can run for several months at no extra cost, and modules can be tested in parallel on the same instance. For the plant this means the licence is not a component of the parallel run cost during the pilot, and the main cost is people's work.
- Double entries: time of the people entering permits and lists.
- Comparison of entries: time of the data coordinator.
- Training users during the period.
- Infrastructure and licences: according to the pilot terms.
Why not start from zero
The typical starting point is work orders on paper and in Excel spreadsheets, companies invited by different people, and training validity tracked by hand. A switch without a parallel run would mean switching off paper on the start day, without proof that the system has complete data.
InnerWeb works as an independent system that complements the client's existing systems, so migration does not require switching off access control, time-attendance, HR or ERP. The parallel run concerns only the OHS and permit registers that the plant keeps on paper today.
Cost of work in the parallel run by length of the period (example)
Example calculation for one hall
The assumptions are illustrative and each plant substitutes its own figures. Let us assume 400 entries a month in one hall, 3 minutes for an additional entry in the system and 2 minutes to compare one entry. That gives 5 minutes per entry, or 2000 minutes a month, about 33 hours.
At a rate of 70 PLN per hour of work, one month of double registers costs about 2330 PLN. Three months come to about 6990 PLN. Shortening the period from 3 months to 1 gives a difference of about 4660 PLN in one hall, without counting the licence cost.
What shortens the parallel run
The period is shortened by preparing the data before the start: a cleaned list of people, the plant structure entered with a test run and a backup, and permit templates configured in the installation data. The fewer corrections after the start, the fewer entries to compare.
The period is extended by duplicated accounts and inconsistencies in the location structure. That is why the cost of the parallel run is not fixed: it is a function of the quality of the data inventory carried out before migration.
When the parallel run ends economically
The end should not be set by the calendar. The plant ends the period when the comparison of entries shows no deviations for a set time, and users work in the system without going back to paper. Then another month of double work costs money and gives no new information.
Cost of double registers in one hall
| Parameter | Value |
|---|---|
| Entries a month in the hall | 400 entries |
| Additional entry in the system | 3 min |
| Comparison of one entry | 2 min |
| Rate of work | 70 PLN/h |
Result: 400 x 5 min = 2000 min, about 33 h a month, about 2330 PLN. Three months: about 6990 PLN; one month: about 2330 PLN.
Note: Example calculation; the figures are assumptions, not data from a specific plant. Prices and licence terms: indicative ranges from 2025-2026 deployments; individual quotation.
Video
Frequently asked questions
How long does the parallel run last?
Usually 1-3 months in one hall. The length depends on the quality of the data before the start and on when the comparison of entries stops showing deviations.
Do I pay the licence during the parallel run?
A pilot can run for several months at no extra cost. Terms after the pilot are agreed individually.
Do I have to switch off access control or time-attendance during migration?
No. InnerWeb works as an independent system that complements the client's systems, so it does not require switching them off.
Let us calculate the parallel run for your hall
Give us the number of entries and the rate, and we will prepare a calculation based on your assumptions.
Let's talk