Project scale: 95 facilities and 120,000 m²
The city project covered 11,000 transmitters in 95 facilities, including all metro stations. The total floor area exceeds 120,000 m², and the location accuracy achieved is below 1.5 m. Simple division gives an average of about 116 transmitters per facility.
This is the largest transmitter network we know of in a single project, so it serves as a reference point for underground facilities: it shows that placing hundreds of units in a building without access to satellite signal is feasible and repeatable.
Why the network matters underground, not a single transmitter
Location works without GPS. The position results from the signals of several transmitters averaged on the map, not from the strongest transmitter. In an underground facility, where the satellite signal does not reach, this is the only sensible method, but it requires that at every point where a position is needed, the phone sees several transmitters at once.
The phone receives the signals of several transmitters together with the strength of each one and sends them over the cellular network or Wi-Fi every few seconds. Underground this raises an additional question: whether the platforms, passages and technical rooms have connectivity that allows the phone to send this data. This is a design condition that is checked before installation, not after it.
Location effectiveness depends on coverage. Alarm and SOS do not work outside network coverage without a separate coverage solution, so the facility plan must indicate the zones where coverage is supplemented in another way.
Floor area per transmitter
Multi-storey buildings: placement vertically
In a multi-storey facility, density is calculated separately for each floor. The general recommendation is 1 transmitter per 100-200 m² in a building, but the city project shows that the requirement for accuracy below 1.5 m leads to a much higher density: 120,000 m² divided by 11,000 transmitters gives about 11 m² per unit.
A second reference point is a deployment in which 100 transmitters across 8 floors were installed in 2 days, without shutting down the installation and without connecting to mains power. On average this is about 12 transmitters per floor. Both examples show that the number of units is determined by the required accuracy, not by floor area alone.
In practice one starts with the floor plan, marking evacuation routes, corridors and places where position matters for safety. Only then is the rest of the area filled in.
Installation in an active facility
Underground facilities usually operate continuously, and installation windows are short. Battery power eliminates work on the electrical installation, and therefore shutdown notices and electrical acceptance tests. Installation comes down to fixing the transmitter in the set place, in line with the layout plan.
During installation the uniqueness of identifiers is checked: the application accepts only transmitters with a manufacturer identifier, and a foreign transmitter is rejected. Two physical transmitters with the same identifier, placed far apart, produce a single position in the system, so at the scale of 11,000 units checking uniqueness is a mandatory task.
After each facility is installed, a test walk is carried out with a phone through all zones, and the position is compared with the plan. Only after such a walk is the facility considered ready for alarms to be launched.
Conclusions for city and underground projects
Transmitter density follows from the required accuracy, not from floor area. Data coverage is a separate condition that must be planned together with placement. Battery power shortens installation in facilities that cannot be shut down, and identifier control protects against errors at the scale of hundreds of units.
For an industrial plant with tunnels, technical basements or cable galleries, the same rules apply on a smaller scale: a floor plan, coverage with several transmitters, coverage checks and a test walk before launch.
Video
Frequently asked questions
Does location underground require GPS?
No. The position results from the signals of several transmitters averaged on the map, so the system works without GPS as long as the phone sees several transmitters at the same time.
How many transmitters does an underground facility need?
It depends on the required accuracy. The general recommendation is 1 transmitter per 100-200 m², while in the city project with accuracy below 1.5 m the average was about 11 m² per unit.
What about the SOS alarm in places without coverage?
Alarm and SOS do not work outside network coverage without a separate coverage solution, so coverage is planned together with the placement of the transmitters.
Let us calculate the transmitter density for your facility
Based on the floor plan we will show how many transmitters match the required accuracy and where additional coverage is needed.
Let's talk