Scenario training for an injection machine operator: how to build it

Scenario training splits an operator's knowledge into steps, each with material, a question pool and a pass threshold. We show how an OHS specialist builds such a scenario for an injection machine operator: from dividing the topics, through preparing questions, to checking that the training works on the kiosk and in several languages.

4
languages in the training kiosk
Source: karta
2
training modes
Source: karta

How scenario mode differs from classic mode

Training runs in classic mode (materials and one test) or in scenario mode (successive steps with material, random questions and the required number of correct answers). Classic mode works well for a short refresher. For a new operator learning the mould clamping zone, interlocks and the procedure for a fault, a scenario works better.

A scenario enforces the order: the operator does not move on to the mould change step until they have passed the step on hazards in the mould zone. Each step has its own pass threshold, so knowledge is checked where it is formed.

Step 1: divide the topic into steps

A good scenario for an injection machine operator has four to six steps. A sample division: hazards of the clamping and ejector zone, guards and safety interlocks, hot surfaces and the barrel, procedure for a fault and emergency stop, participation in a mould change.

Keep each step to one topic that the operator can absorb in a few minutes. A long step with many threads increases the risk that a failure concerns a single detail, and the operator then has to repeat the whole thing.

Sample division of a scenario into steps (questions in the pool)

Sample division of a scenario into steps (questions in the pool)Sample question pool across five steps: 12, 12, 8, 10 and 12 questions.02.557.51012.5questionsMould zone: 12 questions12Mould zoneGuards and interlocks: 12 questions12Guards andinterlocksHot surfaces: 8 questions8Hot surfacesFault: 10 questions10FaultMould change: 12 questions12Mould change
Source: Sample division of the scenario adopted for this guide, contractual values

Step 2: prepare the material and the question pool

The material of a step should show a situation from the hall, not a rule detached from the workstation. Write questions so that they test a decision: what you do when the guard is open and the machine shows ready. A pool larger than the number of questions displayed means that successive attempts do not repeat exactly the same set.

The answer order shuffle switch is on by default, and scoring is calculated on the server side. You therefore do not need to take care of randomising the position of answers, or of someone changing the result in the browser.

Step 3: set the pass threshold

For each step, define the required number of correct answers. For critical topics, such as safety interlocks, set a high threshold, for example all questions correct. For supporting topics, one error can be allowed.

In scenario mode a failed step repeats part of the material, and the final result is saved only after all steps are passed. Make sure the repeat of a step is short and helpful, because the operator will most often see it when tired after a shift.

Step 4: language versions and the kiosk

The kiosk training system supports Polish, English, Ukrainian and Russian. Prepare each step in all the languages used on your shifts. If a version in the account language is missing, the gate requires training in Polish instead of skipping it, which can block entry for a person who does not know Polish.

Translating the material is not enough: the questions must also be checked linguistically. It is best to ask for a review by someone who knows the hall and the language, not only by a translator.

Step 5: check what stays in the audit trail

Changes to permits, the taxonomy of hazardous work and training results are saved in the audit trail with the author and the time. Before the scenario goes live, run it as a trial on a test account and see how the result looks in the register.

Also make sure that the qualifications required for hazardous work are linked to the trainings you have built. The system checks when a permit is created whether the assigned workers hold valid training, so the station scenario becomes part of the chain that admits people to work.

The most common mistakes when building a scenario

The first mistake is steps that are too long, in which the operator goes through ten topics at once. The second is memory questions that test knowledge of a clause number rather than behaviour in a situation from the hall. The third is the lack of language versions, because of which the gate requires training in Polish.

The fourth mistake is setting a pass threshold at a level that does not distinguish people who understand the topic from those who guess. With four answers to choose from, a single question can be guessed, so the threshold should follow from the number of questions in the step, not from habit.

Checklist

Video

Frequently asked questions

Do questions always appear in the same order?

No. Questions in scenario mode are random, and the order of answers is shuffled by default.

Where is the test result calculated?

On the server side, so it does not depend on the operator's device.

What happens after a failed step?

The system repeats part of the material, and the operator tries again. The result is saved after all steps are passed.

Let us build a scenario for your operators

Book a conversation with the InnerWeb team: we will show the scenario editor and the training kiosk using an injection machine operator as the example.