Cost of missing training at the gate: alarm aggregation and calls

When a group of contractors arrives at the gate of an injection plant and some of them have no valid training, each gap can trigger a separate call to the external company's coordinator. We count how many calls can be cut when the system aggregates alarms into one per company within a 55-minute window, using an example day with 12 workers from 3 companies.

-75%
calls on a day with 12 missing trainings
Source: kalkulacja przykładowa
55 min
alarm aggregation window per company
Source: karta
108
fewer calls a year with 12 such days
Source: kalkulacja przykładowa

How the missing training alarm works at the gate

A missing training alarm at the gate creates an emergency permit, and calls to the coordinator are aggregated into one per company within a 55-minute window. Instead of a separate call for each person, the company's coordinator receives a single call with information about all gaps in that company.

When training in the account language is missing, the gate requires training in Polish instead of skipping it, so the number of alarms does not grow because of a missing translation. The plant has one predictable path for every case.

Calculation assumptions

We assume one day on which 12 workers from 3 external companies have no valid training at the gate. The split across companies is 5, 4 and 3 people. We assume one call takes 3 minutes, and the number of such days in a year is 12 (one a month); these are contractual assumptions.

Without aggregation every gap means a separate call, that is 12 calls. With aggregation the system makes one call per company within the 55-minute window, that is 3 calls.

Calls to coordinators on a day with 12 missing trainings

Calls to coordinators on a day with 12 missing trainingsComparison: 12 calls without aggregation, 3 calls with aggregation.02.557.51012.5callsWithout aggregation: Calls: 12 calls12 callsWithout aggregationWith aggregation: Calls: 3 calls3 callsWith aggregation
Source: Sample calculation based on the assumptions in the Calculation assumptions section

Result: number of calls and time

On one day of this pattern, aggregation reduces the number of calls from 12 to 3, that is by 9, or 75 percent fewer. At 3 minutes per call, call time falls from 36 to 9 minutes a day, a reduction of 27 minutes.

Over a year, with 12 such days, this means 108 fewer calls and about 5.4 hours of time for the people who make or take them. The value is not large in hours, but it matters organisationally: a queue of calls that must be handled at the peak of a shift does not form at the gate.

What this number says about the cost of missing training

The main cost of missing training is not the call but the downtime of a person who cannot enter the hall, plus the extra time of the coordinator who has to establish whether the training can be completed on site. Aggregation does not remove the gap, it only organises the communication around it.

That is why the calculation should be read together with the time needed to complete the training at the kiosk. If training can be passed at the kiosk at the entrance in less time than the aggregation window, the coordinator often learns about the problem and its solution in the same conversation.

How a plant can measure its own result

Count the missing training alarms at the gate in one month and divide them by company. The difference between the number of alarms and the number of companies for which a call was made is the number of calls saved by aggregation.

If in your plant there is only one person without training per company, aggregation will not change the number of calls. The gain grows with the size of contractor groups entering at the same time, for example during a large service or the inspection of many machines.

Why the 55-minute window matters in practice

The aggregation window matches the rhythm of a shift: a group of contractors enters the plant within a few dozen minutes, and the company's coordinator does not want to be called every time another person stops at the gate. Within the 55-minute window, all gaps from one company go into one conversation.

For the plant this means predictability: the dispatcher or security knows that after the first alarm for a given company, further ones will not immediately generate new calls. The time saved can be spent helping the people who need to pass training at the kiosk.

Where else the cost of missing training appears

Besides calls, missing training costs the time of the person waiting at the gate, and the time of a security or OHS person who explains the procedure. The calculation does not price this time, because it depends on the local organisation of entries.

A plant that understands this cost usually aims for external companies to pass the training before arriving at the plant, or at the kiosk in the first minutes of the visit. Training in the four kiosk languages reduces the number of cases in which this fails because of a language barrier.

Example calculation

Sample calculation: aggregation of missing training alarms

Assumptions
ParameterValue
Workers without valid training12 people
External companies3 companies
Aggregation window55 minutes
Time of one call3 minutes
Such days in a year12 days

Result: 12 calls instead of 3 in one day: 9 calls fewer, 27 minutes less; in a year 108 calls and about 5.4 hours less.

Note: Sample calculation based on contractual assumptions. The call time and the number of such days are assumptions that the plant should replace with its own measurements.

Video

Frequently asked questions

Does aggregation hide information about individual people?

No. The alarm creates an emergency permit, and it is the calls to the coordinator that are aggregated. The coordinator receives one call per company within the 55-minute window.

What happens when training is not available in the worker's language?

The gate requires training in Polish instead of skipping it. A missing translation therefore does not open the way into the hall.

Can the 55 minutes be changed?

The 55-minute window is described in the feature documentation as binding. Any change requires agreement with the implementation team.