What training modes are available?
Training works in two modes. Classic mode is materials followed by a single test at the end. Scenario mode is a sequence of steps, each with its own material, randomly drawn questions and the required number of correct answers.
For an injection machine operator, scenario mode usually fits better, because it follows the order of work: first the hazards of the mould clamping zone, then interlocks and guards, then the procedure for a fault and for a mould change. Each step ends with a short check, so knowledge is verified while it is still fresh.
What happens when an operator does not pass a step?
In scenario mode a failed step repeats the relevant part of the material. The operator goes back to the content they have not mastered and tries again, instead of moving on with a gap.
The final result is saved only after all steps are passed. This way the register does not show a partial, misleading entry, and the plant has an unambiguous record: training passed in full or not passed.
Can answers in the test be memorised by their order?
The answer order shuffle switch is on by default, so the same answer does not sit permanently in the same position. Questions in scenario mode are drawn at random from a pool, and scoring is calculated on the server side.
Server-side scoring matters for credibility: the result does not depend on the device on which the operator takes the test, and it cannot be changed in the browser. An OHS specialist can therefore treat the record as audit evidence.
In which languages can station training be run on the kiosk?
The kiosk training system supports Polish, English, Ukrainian and Russian. This matters in injection plants, where shifts include people employed through staffing agencies and coming from different countries.
Training in a language the operator understands is a condition for the test to check safety knowledge, not familiarity with Polish technical vocabulary. A kiosk at the entrance makes it possible to run the training even before the first entry into the hall.
What if there is no training in the worker's account language?
When training in the account language is missing, the gate requires training in Polish instead of skipping it. The system therefore does not let a person through simply because nobody prepared a version in their language.
For the plant this is a signal to act on the content side: if workers from a particular country regularly appear, it is worth adding a version of the training in their language. The OHS specialist can see that the Polish requirement came from a missing translation, and can fill that gap.
Does a missing training at the gate block the production shift?
An alert for missing training at the gate creates an emergency permit, and calls to the coordinator are aggregated into one per company within a 55-minute window. The shift is therefore not flooded with a dozen calls when a whole group of contractors without valid training shows up at the gate.
We describe the mechanism in more detail in the cost calculation for missing training at the gate. From the operator's point of view one thing matters: entry to the hall takes place only after the required training is passed.
Which qualifications and training does the system check for permits?
When a permit is created, the system automatically checks whether the assigned workers hold the required, valid qualifications, medical examinations and training. Requirements are defined separately for each type and subtype of hazardous work.
An injection machine operator takes part in work for which they are not the permit's executor, but which they share a zone with: they hand the machine over for service, take part in a mould change, and confirm the closing. That is why the validity of their station training matters also for permits in which they are listed as a team member.
Video
Frequently asked questions
Is scenario mode mandatory?
No. Training can run in classic or scenario mode. Scenario mode gives more control over the order of material and step-by-step verification of knowledge.
Can an operator take the test on the kiosk without an app account?
The kiosk is used for training at the entrance and supports four languages. The scope of access depends on the plant's configuration.
Who sets the pass threshold?
The required number of correct answers is defined in the scenario step. The server calculates the result, so the worker has no influence on scoring.
Does station training replace the initial OHS training?
No. The system provides a tool for running and documenting the plant's training, but the scope of training follows from regulations and the procedures of the given employer.