InnerWeb
Skip to main content

First day with a QR badge: best practices for the training hall

A QR badge carries one code for four uses: the gate check, the invitation, the check in the hall and the login to training. A scan on the tablet does not log anyone in by itself; it only shows whose code it is, and the training starts after a person confirms it. These two rules shape how a Monday with a dozen or so starters is organised.

4
uses of one code on the badge
Source: QR badge function documentation

One code, four uses

The QR badge is a single carrier for several processes: the gate check, the invitation, the check in the hall and the login to training. As a result the new person receives one item for the whole first day and does not have to remember several identifiers.

From the organisation's point of view, issuing the badge is the start of the path, not its end. The same code serves the gate, the hall and the tablet, so an error in assigning the badge to a person carries through all of these processes. The assignment has to be checked once, but carefully.

The scan does not log in: a person confirms

Scanning the badge on the training tablet does not log anyone in by itself. The screen shows whose code it is, and the training starts only after a person confirms it. This way the scan of someone else's badge cannot start a training in another person's name, and the trainer has a chance to notice a mix-up before the result reaches the wrong account.

When training opens from a badge scan, there is no form with company and login at all. Being able to type in someone else's login would be a fault, not a convenience. For participants it also saves time: there is no need to remember or type a login on the tablet, which with a dozen people is a noticeable gain.

Training time for a group of 12 depending on the number of tablets

Training time for a group of 12 depending on the number of tabletsBar chart: 240 minutes with one tablet, 120 minutes with two, 80 minutes with three.050100150200250min1 tablet: 240 min240 min1 tablet2 tablets: 120 min120 min2 tablets3 tablets: 80 min80 min3 tablets
Source: Sample calculation: 12 people, 20 minutes per person, one person per tablet at a time

Organising a Monday for a dozen or so people

For a group of a dozen or so people, an arrangement of three stations works well: issuing the badge, the tablet with the scan and confirmation, and a station at the exit from the room for the completeness check. Each has an assigned person, and the queue moves in one direction.

Issuing a badge includes checking an identity document and matching it with the HR list. At the tablet the person scans the code, the trainer sees the name of the owner on the screen, confirms it and starts the training. At the exit the shift manager checks that each person has a recorded result, and adds to the list those whose training was interrupted.

How many tablets are needed

The number of tablets depends on the length of the training and the number of people in one window. If the training takes about 20 minutes and 12 people start on Monday, two tablets give two rounds of six people in just under an hour. This is a sample calculation, which each plant should adjust to its own material.

Mistakes to avoid

The most common mistake is issuing the badge before it is assigned to a person in the system. The scan then shows no owner or, worse, the owner from a previous batch. The second mistake is leaving a tablet logged in to the session of the previous participant, which spoils the recording of the result.

The third mistake concerns communication. A new person who does not know that the badge will also be needed in the hall treats it as a one-off identifier and leaves it in the locker room. A single sentence of instruction when the badge is issued solves this problem.

Check after the training

After the training, compare the list of people with a badge against the list of people with a result. A mismatch means an interrupted training or a scan of someone else's badge rejected by the trainer. Both situations call for a short conversation, not punishment.

Keep the record of the check together with the start list. It gives evidence that each person was identified, trained and equipped with a badge before they went into the hall.

Example calculation

Training time for the group starting on Monday

Assumptions
ParameterValue
Number of people12 people
Training time per person20 min
Number of tablets2 pcs

Result: 12 x 20 min = 240 min of tablet work; with two tablets, about 120 minutes on the clock.

Note: Sample calculation. It does not include the time for issuing badges or breaks.

Checklist

Video

Frequently asked questions

Does scanning the badge log into the training automatically?

No. The screen shows whose code it is, and the training starts only after a person confirms it.

Do I need to type a login and company on the tablet?

No, when the training opens from a badge scan. There is no form, because typing someone else's login would be an error.

What else is the same badge used for?

One code serves the gate check, the invitation, the check in the hall and the login to training.

Organise a Monday with QR badges

We will show you the layout of stations and tablets for a group starting on the same day and how to check completeness.

Let's talk