What exists and what does not on the infrastructure side
An industrial beacon is a battery-powered device. It is not connected to a power supply and no cables are run to it, so mounting does not involve electricians or the infrastructure department on the scale one might expect from a location system.
Network infrastructure concerns another level: the LoRa nodes and gateways that collect signals and pass them to the server. In a large plant this is about 110 points for about 2,000 beacons, that is one network point for every dozen or so beacons.
The client's scope: a list
The client's responsibility during mounting covers five items. It is worth assigning each of them to a specific person on the plant side before the site survey.
- indication of mounting locations, in line with the placement design
- 230 V power for the nodes and gateways, with PoE where it is planned
- LAN network to the nodes and gateways
- IP addressing: an address pool or reservations for the nodes and gateways
- access to rooms and people for acceptance
Network points versus beacons in a large plant
IT department: network and addressing
The IT department needs three pieces of information in advance: how many nodes and gateways there are, where they are to stand and what addressing they should receive. The sooner the decision on the address pool and network segment is made, the shorter the time the crews wait to launch the nodes.
It is also worth agreeing the access policy for the application server and the way network devices are monitored. The rules are the same as for any other device on the plant network, and the system works independently of the plant's existing systems.
Maintenance: access and permits
For maintenance two things are key: access to rooms and places at height, and work permits for the mounting crews. Mounting about 2,000 beacons under the plant's work permit regime takes about 10 weeks of work by three crews, so the permit procedure must be prepared in advance.
Acceptance of the placement design by the client takes about 2 weeks. This deadline is on the critical path, because the crews do not enter mounting without an approved design.
The person for acceptance
Name the person who confirms the end of mounting in a zone. Without them the zone is not closed, and calibration may be delayed.
What the client does not need to do
The client does not need to run cabling to the beacons, does not need to provide power for each of them, and does not need to replace existing systems. InnerWeb is a software producer, while it purchases and integrates the hardware, so the supplier is responsible for the devices and their configuration.
The InnerWeb beacon has an industrial design, a CE declaration and an ATEX construction for zones 2/22. For explosion-risk zones the maintenance team should pass the zone classification to the supplier before the placement design.
Checklist
Video
Frequently asked questions
Do beacons need a power supply?
No. Beacons are battery-powered and need no power supply or cabling. Only the LoRa nodes and gateways require PoE power and network connections.
What must the IT department prepare?
LAN for the nodes and gateways, IP addressing and access to the server in line with the plant's policy.
How long does acceptance of the placement design take?
In a large rollout about 2 weeks on the client side.
Check the scope on the IT and maintenance side
Send us the plant layout and we will indicate the number of nodes, gateways and client scope items.