What security sets when registering a delivery
Security records the choice of voice navigation and language, and the marking of a delivery under special supervision, at the delivery locator. There is therefore no separate configuration screen for the driver: the settings are made at the gate, in the same place where the locator is assigned.
This guide assumes the delivery has already been created, most often by entering the notice card code, and the system has pre-filled the form. Security checks the data and only then switches navigation on, so that the messages lead to the correct warehouse.
Steps at the gate
The order below limits mistakes and lets everything be done in one conversation with the driver. Each step has a short check that security sees on the terminal.
- Enter the notice card code and check that the delivery form was filled with the driver and vehicle data.
- Make sure the target dock code is entered in the delivery. It defines the warehouse the navigation leads to.
- Assign a delivery locator from the pool and confirm it on the terminal.
- Ask the driver about the language and choose one of the 10 voice message languages.
- Switch voice navigation on at the delivery locator.
- If the delivery needs special attention, mark it as under special supervision.
- Hand over the locator to the driver and explain that the voice will guide them at junctions, and that road signs still apply.
- Check on the online map that the vehicle appeared with the correct colour.
Colours on the map as a check
The online map marks a vehicle with navigation for a foreign driver in red, under special supervision in black, and an ordinary one in white. If the vehicle is still white after navigation is switched on, the setting was not saved and it is worth repeating it.
What security does not need to do
Security does not edit the navigation matrix, does not set routes and does not measure distances. The matrix, meaning the table of directions for junctions, is maintained by the administrator in the panel on the fly. The role of security is solely to switch the service on for a specific delivery and language.
This helps training: a change at the gate does not require knowledge of the road layout, only familiarity with the steps in the list above and the ability to ask the driver about their language.
Common errors and how to recognise them
The most common error is a delivery without a target dock code. Navigation leads to warehouses covered by the matrix, and the dock code defines the warehouse, so without it the messages have no destination. The second error is choosing a language the driver does not understand: it is worth asking rather than guessing from the vehicle registration.
The third is expecting the system to calculate the route like GPS. Voice navigation is not GPS and not live routing, only a matrix of directions. If the driver leaves the route, the system may fall silent, because the relative direction is calculated from the actual approach and a lack of certainty means silence.
Proof of completion and checks after the change
After registration is finished, security has a trace on the terminal and on the online map: the language, the choice of navigation, the supervision marking and the assigned locator. The dispatcher can review these settings without calling the gate.
Once per shift it is worth checking the locator pool in the service tab: devices with a battery of up to 5% or offline are flagged there with a recommendation to recharge, so a locator handed to a driver should be charged.
Video
Frequently asked questions
Who chooses the message language?
Security chooses it at the delivery locator, after asking the driver, from one of 10 languages.
Why doesn't navigation lead to the warehouse?
Most often because the delivery has no target dock code, or the warehouse is not covered by the navigation matrix.
How do I check that the setting worked?
On the online map the vehicle with navigation for a foreign driver is red, and under special supervision it is black.
Let's train security at the gate
We will run a short briefing for the security shift and show the terminal steps on a sample delivery.
Let's talk