InnerWeb
Skip to main content

Evacuation list in clean zones: how to read it

The evacuation coordinator at a pharmaceutical plant has a list of people at the assembly point, but some guests are in airlocks and clean zones that nobody can enter without changing clothes. This guide explains how to read the list built from QR scans at the gate, what its groups mean, and why the list prefers to show too many people rather than too few.

13 s
refresh interval of the evacuation list
6
groups of people on the list

Where the list comes from

The evacuation list is built from QR scans at the gate. Every recorded entry or exit scan changes the status of a person, and the list refreshes every 13 seconds. The coordinator therefore does not wait for data to be copied by hand and does not work from a sheet of paper from an hour ago.

It is important to distinguish what the list knows from what it does not know. It knows that a person entered through the gate and that no exit was recorded. It does not know which airlock or room of the clean zone the person is in at the moment, if the plant has no additional reading points inside. That is why the list is a starting point for a check, not an assurance that someone is in a specific place.

Six groups and the rule of showing too many

The list divides people into six groups, and every trade-off is resolved in favour of showing too many people. In an evacuation, a person shown on the list by mistake costs a moment of checking, while a person not shown who is still in the building costs far more. That is why the system does not remove a person from the list until an exit is confirmed.

Six groups allow the coordinator to assign responsibility: different people are responsible for employees, others for guests, and others for service visits. From the procedure's point of view it is important that the plant decides in advance who reads which group and who confirms presence at the assembly point.

People already on site can always leave

The declaration is required only at entry, so a person already on site can always leave. This rule has a direct link to the evacuation list: a guest whom the gate would refuse to let out for lack of a declaration would remain on the list until the night checkout and distort the picture. Thanks to this rule an exit is always possible, and the list reflects reality.

Guests in airlocks and clean zones

Guests in the clean zone are on the list just like everyone else. The plant should describe in its evacuation instructions how people from the clean zone leave it in an emergency, and the coordinator at the assembly point compares the list with those present. People on the list who are missing are reported to the search team in line with the plant's procedure.

Number of list refreshes during an evacuation

Number of list refreshes during an evacuationLine chart: with a refresh every 13 seconds the list refreshes 4 times in a minute, 23 times in 5 minutes and 60 times in 13 minutes.0204060refreshes1 min5 min13 min1 min: 4 refreshes45 min: 23 refreshes2313 min: 60 refreshes60
Source: Calculation from the 13-second refresh , values rounded down

How to read the list step by step

The evacuation coordinator should go through the same questions at every exercise, so that reading the list becomes a habit.

  • Check the time of the last refresh: the list refreshes every 13 seconds, so an older state means a connection problem.
  • Go group by group and mark those present at the assembly point.
  • Pay attention to guests from service visits: their host knows the scope of the work and the location.
  • Report the remaining people to the rescue team as unlocated, not as absent.
  • After the exercise, record the discrepancies between the list and the actual state and pass them to the quality department.

What to do before the first exercise

Run an exercise with a few guests and service technicians in the clean zone and a few people in the airlocks. Compare the list from the assembly point with the list from the system and record how many people needed clarification. The result of the exercise is evidence for the quality department that the evacuation procedure covers guests, not only employees.

A plant where the declaration requirement applies should also check that people leaving without a declaration are not held at the gate. Under the system rule an exit is always possible, so a hold would mean a configuration error.

Video

Frequently asked questions

Does the list show which airlock a guest is in?

The list is built from QR scans at the gate, so it shows who entered and did not exit. Position inside the clean zone requires additional reading points or a description in the plant's procedure.

Why does the list show more people than are in the plant?

The list resolves trade-offs in favour of showing too many people. An unnecessary check costs less than missing a person who remained in the building.

What about a guest who did not submit a declaration and wants to leave?

Exit is always possible, because the declaration is required only at entry. This way nobody stays on the list until the night checkout.

Let's rehearse the evacuation list with guests

In a demo we will show the list built from QR scans, the six groups and the 13-second refresh. Book a conversation with InnerWeb.

Let's talk