InnerWeb
Skip to main content

Training on the employee number alone: link and QR code

Part of the production workforce has neither a company e-mail nor a phone, yet OHS training has to be delivered and documented. This guide explains how the administrator creates accounts on the employee number alone and runs training with a shared link and a QR code printed for the notice board.

4 languages
kiosk training: PL, EN, UA, RU
Source: karta
4 messages
browser QR scanner error messages
Source: karta
0 e-mails
required to create an account on the employee number
Source: karta

Who is this path for, and what risk does the site accept?

This path is for employees on the shop floor, in the warehouse and in production who have no mailbox or company phone, but have an employee number assigned by the site. The account is created on that number, without an e-mail address or a phone number.

The employee number is not secret, so on this path the site knowingly accepts the risk of impersonation: someone could enter another person's number. It is mitigated by the question “Is it you?” on the tablet and by the record of completed training. If the site requires stronger identification, it chooses a card or a QR badge with a personal token.

Step 1: create an account on the employee number

The client administrator adds the employee in the panel, entering first name, last name, company and employee number. The system does not require an e-mail address or a phone number for such an account.

Before creating it, check whether the person's account already exists. Training login does not create accounts quietly: it first searches for an existing account and logs in by its identifier, so a duplicate appears only when someone creates it by hand.

Elements of the employee number training path

Elements of the employee number training pathHorizontal bar chart: four material languages, four scanner error messages, four steps of the procedure01234numberMaterial languagesMaterial languages: 4 number4Scanner error messagesScanner error messages: 4 number4Administrator procedure stepsAdministrator procedure steps: 4 number4
Source: Feature cards: kiosk training system and QR scanner in the browser

Step 2: download the window with the QR code and link

The panel shows a window with a QR code and a link to the training. The link is shared by the group and does not expire, so it can be printed and hung on the notice board or at the training station.

A shared link does not carry the identity of a particular person: each employee enters their own number or confirms their identity on the tablet. Remember that the code does not expire, so taking it down from the board is the only way to withdraw it.

  • The window with the QR code and link is available in the client administrator's panel.
  • Print the QR code at a size that can be read from a few steps away.
  • The link is shared and does not expire.
  • For an unattended kiosk with a scanner, use the link with a rotating access token.

Step 3: the employee scans the code and confirms identity

The employee scans the code with their own phone or with the site's tablet. The tablet asks “Is it you?” and leads to the next required training. The scan logs nothing: the tablet shows the first name, last name and company of the owner, and training starts only after confirmation.

The training covers identification, material in the form of PDF slides or a video, and a multiple-choice test. The material is available in four languages: Polish, English, Ukrainian and Russian, which makes training multinational teams easier.

Step 4: set up an unattended kiosk

An unattended kiosk with a code scanner uses a link with a rotating access token. Rotation means that the old link stops working after a change, so a leak of the kiosk address does not give permanent access.

The scanner in the browser uses the native code detector and, when it is missing, loads a decoding library only when needed. It does not use external content delivery networks, because the site firewall silently drops such traffic. When the scanner does not work, it shows one of four messages: camera permission denied, no camera, an insecure context (plain HTTP), or no support.

Audit evidence and the limits of this path

The evidence of training is the record of completion on the account with the employee number: the date, the material, the test result and the confirmation “Is it you?”. This supports showing that the employee completed the required training, but it does not replace the site's decision on the level of identity verification.

If the employee later receives a card, the account on the employee number can be linked to the card and the transferred results remain in use. We describe the details of linking in the guide on the training account with a card.

Checklist

Video

Frequently asked questions

Does the training link expire?

The shared link from the panel window does not expire. An unattended kiosk with a scanner uses a link with a rotating access token.

Does the employee need a phone?

No. Training can be run on the site's tablet, and the account is created without e-mail and phone.

Can someone impersonate another employee?

The employee number is not secret, so the site knowingly accepts this risk. The question “Is it you?” and the record of completed training limit the consequences, and a card or QR badge gives stronger identification.

What languages is the training available in?

In Polish, English, Ukrainian and Russian. The material can be PDF slides or a video, followed by a test.

Run training for the workforce without e-mail

Book a call: we will show an account on the employee number, the QR code window and kiosk training in four languages.

Let's talk