InnerWeb
Skip to main content

How to link an employee card to a training account

A training station must know who is standing in front of it, and it must not show a staff list while doing so. This guide explains how an employee finds their account with a card or by searching the surname, and how the administrator tidies up the case of two accounts for the same person.

3 characters
minimum in the account search
Source: karta
13
maximum number of results
Source: karta
4 languages
kiosk training: PL, EN, UA, RU
Source: karta

Goal: identity without a staff list

A training station has a tablet that many people use, so the screen cannot display a list of employees: it would be a leaking list of personal data. For this reason identification relies on the carrier in the employee's hand or on a few characters the employee types in personally.

Both methods end in the same way: the system finds the existing account and logs in by its identifier, rather than creating an account quietly. A typo in the login therefore does not create a phantom employee.

Step 1: tap the card on the station reader

At a station with RFID card integration, the employee taps the card. The system looks up the account with an active card and shows the first name, last name and company. Training starts only after confirmation by the person, which protects against scanning a colleague's card.

This step is the fastest and requires no typing. The card is not shown on the screen either: the search never reveals the card number.

Account search parameters at the training station

Account search parameters at the training stationBar chart: minimum 3 characters of the surname, maximum 13 results, four training languages051015numberMinimum surname characters: 3 number3 numberMinimum surname charactersMax. results: 13 number13 numberMax. resultsTraining languages: 4 number4 numberTraining languages
Source: Feature cards: account search by RFID card and kiosk training

Step 2: no card? Search the account by surname

The employee selects the company and types part of the surname. The search requires at least 3 characters, returns up to 13 results and shows only active accounts with an active card. An account without a card does not appear in the results, so an employee without an assigned card is referred to the administrator.

Limiting the number of results and the minimum number of characters reduces the risk of browsing the staff: a few letters are not enough to display everyone.

  • At least 3 characters of the surname.
  • At most 13 results per query.
  • Only active accounts with an active card.
  • The card number is never shown.

Step 3: confirm it is you and start the training

After the account is selected, the tablet asks “Is it you?”. A yes answer starts the training: identification, material in the form of PDF slides or a video, and a multiple-choice test, in Polish, English, Ukrainian and Russian. A no answer returns to the search.

When entry is from a QR badge, the form with company and login is not shown at all, even if the code was not recognised. This way it is impossible to type another person's login.

Two accounts for the same person: what does the administrator do?

When the same person has two active accounts, the system moves the training result to the account with the card, so the gate stops reporting a missing training. It does not merge accounts by surname alone, because two different people can share a surname. The transfer resolves the symptom at the gate, but the administrator should tidy up the cause.

How to recognise a duplicate account

A typical signal is an employee who has completed the training while the gate reports it as missing. The administrator checks whether two accounts with the same surname exist in the same company, and compares which of them has the card.

What to do after the result is transferred

Keep the account with the card as the correct one, and disable the second one after checking that nothing depends on it. Only then will the security panel show the full verdict: valid trainings, qualifications for hazardous work, an open permit and an active account.

Evidence for an audit

An auditor will ask how it is known that the training was completed by the right person. The evidence is the record of identification with the carrier, the confirmation “Is it you?” and the test result on the account with the card. A scan alone logs nothing, so confirmation by the person is part of the trail, not an extra.

Checklist

Video

Frequently asked questions

Does the tablet show my card number?

No. The search does not reveal the card number and shows only the first name, last name and company.

What if I cannot see myself in the results?

An account without an active card does not appear in the results. Contact the administrator to assign a card or to set up an account on the employee number.

Will the system merge my two accounts on its own?

No. It does not merge by surname alone. It transfers the training result to the account with the card, and the administrator tidies up the duplicate.

Does scanning a card pass the training?

No. The scan shows the account to be confirmed, and passing requires the material and the test.

See identification at the training station

Book a demo: we will show a card tap, the account search and the transfer of the result for two accounts.

Let's talk