InnerWeb
Skip to main content

Temp worker induction training: a guide for OHS

Introductory training for a temporary worker should take place before admission to work, and proof of completion must be shown at an audit. This guide describes the successive steps of the OHS specialist: from setting the division with the agency to recording the result in the system.

2
forms of training: classic and scenario-based
Source: product card

The obligation: what the rule says and what the contract sets

Introductory training, meaning general and workstation instruction, should take place before a temporary worker is admitted to work. This is the starting point of the whole procedure: not the first week, not after the first shift.

Who conducts each part is described differently in commentaries. For that reason the division of training between the agency and the user employer is set in the contract and according to the text of the act. This guide assumes that the contract already exists and indicates which elements the plant conducts.

How to meet the obligation step by step

The order matters, because each step prepares the next one. Skipping step 2 means that step 5 falls on the first day.

Step 1: set the division of training with the agency

Write into the contract or an annex which trainings the agency conducts and which the plant does, and who confirms completion. The entry in the contract is the basis for the auditor.

Step 2: set up the company and the coordinator in the system

An external company has a contact person chosen from that company's accounts. The server rejects a person from another company or one without the coordinator role, so the agency must indicate the correct account.

Step 3: invite people and choose the form of training

An invitation requires an e-mail address or a phone number. Training can be classic, meaning materials and a test, or scenario-based, with steps in which a failed step repeats the material. The scenario form suits training with several decisions, for example an evacuation.

Step 4: keep the test honest

The order of answers in the test is mixed by default at every attempt, and points are counted by answer identifier. Remembering that the second option is correct is not enough to pass.

Step 5: check qualifications before the permit

When a permit is created, the system checks whether the assigned workers have the required qualifications, and warns about documents expiring before the deadline. A person without a passed training does not get onto a permit for dangerous work.

Proof for the audit

The auditor will ask three things: who completed the training, when and with what result, and whether this happened before admission to work. The result recorded on the person's account answers the first two questions. The third follows from comparing the training date with the date of the first gate entry.

When a person returns to the plant, the introductory training does not have to be repeated on re-employment of the same worker by the same user employer in the same position, according to the MPiPS position. The OHS specialist decides whether this case applies, and the system provides the previous result.

A result recorded on a duplicate account that was merged is moved to the active account, for up to three merges, so merging accounts does not destroy the evidence.

Most common mistakes

The first mistake is training on the first day with a paper list that cannot later be compared with the gate log. The second is creating a new account for a person who already has one with another external company, which splits the result into two records. The third is assuming that general training replaces workstation instruction.

Checklist

Video

Frequently asked questions

Can introductory training be run online before arrival?

The general part, yes, if the plant opens such a path. Workstation instruction takes place on site, and both parts must be passed before admission to work.

What if the test is passed only after several attempts?

The result is recorded regardless of the number of attempts, and the order of answers is mixed each time. The rules on the number of attempts are set by the plant.

Does the system replace the OHS specialist?

No. The system documents the course and checks qualifications, while decisions on admission and the interpretation of rules belong to the OHS specialist.

Sources

Let us organise the agency's introductory training

We will show OHS how to set up training, the test and recording of the result for temporary workers. Let us arrange a short talk.

Let's talk