Who this is for, and what is certain
The recommendations are for the OHS manager and the OHS specialist at a plant that is the user employer of temporary workers. The certain point: the introductory training, which is the general and workplace induction, should be completed before a temporary worker is admitted to work.
The point that requires care: how this training is divided between the agency and the user employer is described differently in commentaries. We therefore recommend not relying on memory or habit, but on the text of the law and the clause in the contract, and asking a lawyer or a labour inspector when in doubt.
Recommendations 1 and 2: split the parts and name the person responsible
Recommendation 1: divide the process into three parts, meaning general OHS knowledge, the plant's own rules and workplace induction, and assign each part a person and a date. Recommendation 2: enter that person in the plant's procedure. When someone asks after an incident who trained them, the answer must name a role holder, not a collective responsibility.
In practice the best arrangement is one in which the general part and the plant's rules are delivered in the system before day 1, and the workplace induction is led by the direct supervisor on the first day.
Sample split of introductory training time (60 min)
Recommendations 3 and 4: which steps to move into the system
Training in the system can follow a classic path of materials followed by a test. It can also be a scenario path with steps, where a failed step sends the worker back to the material. For agency workers, who often have no experience in a given industry, the scenario path is safer, because it does not let the worker move on without understanding the step.
The test shuffles the order of answers by default on every attempt, and points are counted by answer identifier. Recommendation 4: do not switch the shuffling off unless you have a reason related to accessibility, because it limits prompting one another within the group.
- general part and the plant's rules: in the system, before day 1
- knowledge test with date and result: in the system
- workplace induction: on the hall floor, with a record of completion
- repeat after a failed step: automatic in the scenario path
Recommendation 5: qualifications and permits as a second gate
Introductory training is only the beginning. When a permit is created, the system checks whether the assigned workers have the required qualifications and warns about documents that are about to expire. For agency workers this means that a permit for hazardous work is not issued to a person without the required document, rather than the gap being found only after an accident or in an inspection.
Practical recommendation: for each position, define the minimum set of qualifications and keep it in the system. The agency receives the list of requirements together with the invitation, so it recruits people for a specific set.
Recommendation 6: do not repeat needlessly, but confirm the position
According to the position of the Ministry of Family, Labour and Social Policy (MPiPS), when the same worker is rehired by the same user employer for the same job, the introductory training does not have to be repeated. In the system this recommendation is simple to apply: the same person has one account, and training results stay with that person even after a move to another external company.
The trap: the job changes, but the training does not. Make sure the description of the workplace training lists the scope of the job. Then the decision on whether to repeat training follows from a comparison of scopes, not from a hunch.
What about duplicate accounts
In practice it happens that the same person registers twice, once through the agency and once on their own. A training result recorded on a duplicate account that is later merged is transferred to the active account, for up to three merges, rather than being lost with the deleted account. The OHS manager therefore does not have to copy results by hand after the administrator merges the accounts.
Video
Frequently asked questions
Does training in the system replace the workplace induction?
No. We move the general knowledge and the plant's rules to the system. The workplace induction is led by a person designated by the plant on the hall floor.
Must training be repeated when a worker returns?
According to the MPiPS position, not when they are rehired by the same user employer for the same job. The plant confirms the arrangement with a lawyer.
What if someone passed the training on a duplicate account?
After the accounts are merged, the result moves to the active account, for up to three merges.
Sources
Let us show the scenario training for the agency
We will go through the path from the invitation to a passed test with your OHS team and agree which parts of the training to move into the system.
Let's talk