Before you start: what must be ready
An extra training uses the same engine as the mandatory trainings: a video or PDF and a test. Before you share it more widely, make sure the material is uploaded, the test works and the training is active. A link and QR code can be shared only for an active extra training.
Remember that an extra training is voluntary: it never blocks entry or the performance of work. If you expect a person not to enter without passing it, you need a mandatory training, not this guide.
Step by step
Five steps from an active training to the first completion.
Step 1. Open the training and get the link and QR code
The link is assigned to the training, not to a person. That is why you can distribute it widely before the participants are known. The system lets you copy the data and download the QR code as an image.
Step 2. Choose how to reach people
Start with named invitations: the system records who was invited and through which channel (e-mail, SMS, QR code), so you can see who is overdue. When an invitation cannot be delivered through any channel, the system shows the link and QR code for the training, so you can print a card or send it through a messenger.
Step 3. Tell participants how they identify themselves
At the extra training gate a person identifies with their registry number, an e-mail address with the company name or a phone number, without creating an account. In the message, state which method the plant prefers. For people without e-mail and phone, the registry number assigned by the organization is enough.
Step 4. Watch the first person
Ask one person from your trusted team to enter from the QR code first. After entering through a link that contains the registry number, the system asks 'Is it you?' and only after confirmation starts the next required training of that person. Check whether the question appeared, whether the material plays and whether the result was saved in the register.
Step 5. Only then print the posters
After a positive test with one person, print the QR code on posters, cards in the changing room and information boards. One faulty code on a printout, corrected after it has been hung, costs more than five minutes of testing.
What to watch for with the first person
With the first person you check three things. First: whether identification worked with the method you announced in the message. Second: whether the 'Is it you?' question appears after entering through the link with the number. Third: whether, after passing, the result is visible in the named register of invitations. If any of these three does not work, fix it before sending to everyone.
If you run a room training in parallel, remember that each active extra training has at most one open attendance list, which both people added by hand and people entering from the QR code join.
Risk you need to know about
Anyone who knows someone else's registry number can complete the training in that person's name. This also applies to the QR code of an extra training. This risk is accepted knowingly for a voluntary training. Practical measures: do not post lists with numbers, treat the registry number as an internal identifier, and for critical topics choose a room session with a signature or a mandatory training.
The register is the audit evidence: who was invited, through which channel, who passed and when. This supports the fulfilment of internal training requirements, but it does not replace the plant's decision on which topics are mandatory.
Video
Frequently asked questions
Does every person need an account to enter from the QR code?
No. At the extra training gate a person identifies with the registry number, e-mail with the company or phone, without creating an account.
Does the link work for one person only?
No. The link is assigned to the training, not to a person, so you distribute it widely.
What if the invitation does not reach anyone through any channel?
The system shows the link and QR code for the training, with an option to copy the data and download the code, which you can print or send in another way.
Launch your first training with a QR code
We will go through the five steps with your coordinator on a live training and check the first person together. Arrange a meeting with the InnerWeb team.
Let's talk