Where dimensions are entered and in which units
Room dimensions are given in metres. The width and length fields are available for a room on the floor plan, and their values correspond to the real dimensions, so it is worth measuring them or reading them from the drawing rather than estimating by eye.
A good habit is to record the dimensions in a working table before entering the editor. Then entering becomes a matter of copying the numbers, and any discrepancies with the drawing come to light before saving.
What happens to the outline when the dimensions change
Changing the width or length scales the outline around its centre and along its own axes. This means the room does not move and does not turn into a parallelogram, even if it is rotated on the plan. The centre stays in place, and the boundaries spread or close in symmetrically.
The practical conclusion: first set the position of the room's centre, then its dimensions. The reverse order forces you to correct the position after every change of size.
Wall thickness on a floor plan
A technology line has no room dimensions
A technology line has no width or length in the sense of a room, and it does not get dimension fields. Its outline is drawn as a shape rather than given in numbers. This is a frequent source of questions: the administrator looks for fields that were not provided for a line.
Each line receives a default location Other at its centre. When the outline changes, only those pins that fall outside the new outline are moved, while manually placed ones stay where they are. In this way correcting the shape does not undo earlier work.
Outline and wall colours: how to read a floor plan
Rooms on the floor plan have a black outline 0.55 m wide, so that neighbouring rooms do not merge into one blob. The walls of the building in which the user is located are red, and the walls of a line or room are blue. Line walls are 0.55 m thick, compared with 1.6 m for building walls.
Knowing these parameters helps when designing a layout. If two rooms are meant to adjoin, the gap comes from the 0.55 m outline thickness, not from a drawing error. It is therefore not worth forcing the dimensions so that the outlines coincide.
What the online map will not do for the administrator
The online map is a view of the interior: it highlights, describes and lets you go deeper, but it does not edit the structure or assign risks. Dimensions and outlines are changed only in the editor. A dispatcher who notices an error reports it to the map administrator, rather than trying to correct the floor plan from the view.
After changing dimensions it is worth looking at the floor in the online view and checking that the pins fit within the outlines and that the wall colours match expectations.
Video
Frequently asked questions
Why are there no width and length fields for a line?
A technology line is not a room. Its outline is drawn as a shape, and pins and locations are assigned to that shape.
Will changing the dimensions move the pins?
Only pins that fall outside the new outline are moved. Pins placed by hand that stay within the outline remain where they are.
In which units are dimensions given?
In metres. The values should come from the drawing or a measurement, not from an estimate by eye.
Let us prepare the floor plans for the editor
We will show dimension entry and outlines on a sample floor and suggest which measurements to collect before starting work.
Let's talk