What the dispatcher sees on the floor plan
The online map is a view of the interior: it highlights, describes and lets you go deeper, but it does not edit the structure or assign risks. The dispatcher therefore looks at a plan that the administrator prepared and cannot correct it during an incident. That is why the plan must be readable from the first look.
The map administrator is responsible for three things: the room outlines, their dimensions and the placement of the location pins. Each of them has specific settings that decide readability.
A 0.55 m outline: neighbouring rooms do not merge
Rooms on the floor plan have a black outline 0.55 m wide, so that neighbouring rooms do not merge into one blob. In a row of small rooms along a corridor, the outline decides whether the plan looks like a layout of rooms or like one grey surface.
Practice: do not widen the outlines by hand to match the building plan. The outline thickness is fixed, so a room should be drawn according to its internal dimensions.
Thickness of floor plan elements (m)
Dimensions in metres and scaling around the centre
Room dimensions are entered in metres. Changing the width or length scales the outline around its centre and along its own axes, so the room does not move and does not turn into a parallelogram. This is convenient for correction: the administrator can fix one dimension without moving the neighbours.
Practice: before entering dimensions, measure the room or take them from the design, and after entering them compare the plan with reality in one room. An error in one dimension usually repeats along the whole corridor.
A technology line has no width or length
A technology line has no width or length in the sense of a room and does not get dimension fields. If the administrator looks for dimension fields for a line and cannot find them, that is not an error but a feature of this type of object. A line is described by its outline, not by room dimensions.
Wall colours: building red, room blue
The walls of the building the user is in are red, and the walls of a line or a room are blue. The walls of a line are 0.55 m thick, against 1.6 m for the building walls. The difference in colour and thickness lets the dispatcher tell whether they are looking at an external or an internal wall, without reading the descriptions.
Practice: do not change wall colours or thicknesses as local adjustments, so that all users in the plant see the same visual language. Consistency matters more than the look of a single plan.
Pins: the default location Other in the centre
Each line gets the default location Other in its centre. When the outline changes, only the pins that fall outside the new outline are moved, and manually placed ones stay where they are. This way correcting an outline does not destroy a location that was set earlier.
Practice: after each outline change, check whether a default pin has landed where it makes no sense for the room, for example in a wall or on an edge.
Acceptance of the floor plan
The floor plan is accepted on a walk with a second person. One person walks the floor with a phone, and the other checks on the map whether the position matches the room. Differences are recorded in the protocol with the room number and the dimension to correct.
If the plan has several floors, the acceptance is repeated for each of them, because an error on one floor does not follow from an error on the others.
Checklist
Video
Frequently asked questions
Can the dispatcher correct the floor plan on the online map?
No. The online map is a view: it highlights, describes and lets you go deeper, but it does not edit the structure or assign risks.
What happens to the pins after an outline change?
Only the pins that fall outside the new outline are moved. Pins placed manually stay where they are.
Why does a line have no width and length fields?
Because a technology line is not a room. It has no width or length in the sense of a room and does not get dimension fields.