Why the entry book stops being enough
An entry book records who came in, but the record is made after the fact and depends on the goodwill of whoever writes it. At distributed sites that engineers visit without permanent staffing, entries are sometimes missing, and when there is an entry, nobody verifies permissions.
The second weakness is evacuation and incidents. From a book you cannot read in a few seconds who is on site. The evacuation list from the electronic register is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups, including external companies and people whose status is uncertain.
Steps 1 and 2: gate inventory and badge issue
Step one is a list of the entry points where the book is used today: main gate, service wicket, chamber entrance. For each one, record who opens it and whether there is an access control reader. This list decides the number of scanning points.
Step two is QR badges for people who enter the site: own employees, regular engineers and external companies. The badge is an identifier that the system recognises at the scan, so it does not have to replace the access card: both can work in parallel.
Parameters of the electronic entry register
Steps 3 and 4: gate scan and verdict
Scanning a QR badge or RFID card on the security screen gives a verdict on whether the person may be on site. It combines valid training, qualifications for hazardous work, a permit in progress and an active account. The scan at the gate is itself a control act and records the entry, so the book is no longer needed for recording attendance.
At unmanned sites the engineer scans on their own phone, or a screen stands at the gate. In both variants the key point is the same: the record is made at entry, not after returning to the office. Actions in the field without Wi-Fi are queued locally in the device's browser and replayed when the network returns, and resending does not create duplicates.
Step 5: connect existing access card swipes
You do not have to replace cards or readers. InnerWeb receives card swipe events from the access control system through an HTTPS message initiated by the plant on port 443, with no inbound ports opened. Authentication uses a technical account and a token with limited validity, renewed automatically by the integration.
Three things remain to be agreed with the access control vendor: whether the system can send HTTPS POST in real time, with event time, direction and event identifier; which readers mean entry and which mean exit; and card export. The rules for pairing entries with exits and rejecting duplicates are set in the integration specification.
Steps 6 and 7: parallel running and switching off the book
For the first two weeks, keep both records in parallel and compare them every day. Discrepancies show which entries bypass the scan: usually a wicket nobody thought of, or a reader left out of the configuration.
When the discrepancies disappear, the book can be switched off. Keep its last scan or a copy in the archive according to your own documentation policy, because the history of entries before rollout is sometimes needed in disputes.
Audit evidence
After moving to the electronic register, every entry has the time and place of the scan, and changes to permits and training results are saved with author and time. The auditor receives a sequence of events, not a notebook to browse.
Checklist
Video
Frequently asked questions
Do access cards need replacing when moving to QR?
No. Integration with access control needs no replacement of cards or readers, and the QR badge works in parallel with the cards.
What about entries where there is no Wi-Fi coverage?
Actions that change data in the field are queued locally in the device's browser and replayed when the network returns. The backend recognises repeats, so no duplicates are created.
How long does moving from the book to the electronic register take?
Issuing badges and configuring gates depends on the number of entry points. A parallel period of about two weeks is recommended to catch entries that bypass the scan.
Start with one gate
Book a conversation with InnerWeb and set up the QR badge scan at a chosen facility, keeping the existing access control cards.
Let's talk