FAQ: access card and work permit at a pumping station

Swiping a card at the access control system confirms that the door or gate was opened with an authorised card. It does not confirm that the engineer holds valid qualifications or a permit for the specific job. This page collects answers to the questions most often asked by facility managers at water and wastewater sites, security staff and service providers.

443
HTTPS port from which the plant system sends swipe events
Source: card
13 s
refresh interval of the evacuation list
Source: card
6
groups on the evacuation list
Source: card

Does swiping an access card let you into a pumping station?

A card swipe answers one question: is this card allowed to open this passage at this time. The access control system knows the card, the reader and the schedule, but usually does not know whether training is valid, whether the person holds permits for confined spaces, or whether a work permit was issued for the job. That makes the card a necessary condition for entry, but rarely a sufficient one.

At water and sewage facilities the difference matters in practice. A pumping station, a valve chamber or a tank are places where entering without a permit can mean entering a space with elevated risk. Opening a gate says nothing about whether the crew is allowed to work in the chamber.

That is why the access card should be treated as the first of three layers: identity and right of access to the gate, the qualifications of the person, and a permit for the specific job. InnerWeb does not replace the first layer and does not replace any readers. It takes swipe events from the access control system and links them with the other two layers.

What else does the system check when a QR badge or RFID card is scanned?

Scanning a QR badge or RFID card on the security screen gives a verdict on whether the person may be on site. It combines four things: valid training, qualifications for hazardous work, a permit in progress and an active person account. Security sees one result instead of four separate lists.

The scan at the gate is itself a control act and records the entry. The attendance register is therefore built as a by-product, without a separate paper log. The scan leaves a trace with time and place that can be shown later during an audit or when analysing an incident.

Training and qualifications

The system checks whether required training is valid on the day of entry. An expired OHS training or a missing authorisation for work in confined spaces is visible at once on the screen, not only during an inspection after an incident.

Permit in progress

The verdict takes into account whether a permit in progress exists for the person. An engineer with a valid card but without a permit for today is stopped at the decision stage, not at the accident stage.

Evacuation list and entry control parameters

Evacuation list and entry control parametersHorizontal bar chart with three parameters: evacuation list refresh every 13 seconds, six groups on the list and three layers of entry control.051015value in the stated unitEvacuation list refresh(seconds)Evacuation list refresh (seconds): 13 value in the stated unit13Groups on the evacuation list(count)Groups on the evacuation list (count): 6 value in the stated unit6Entry control layers (count)Entry control layers (count): 3 value in the stated unit3
Source: Card sheet: access control event integration and evacuation list

Does a work permit check qualifications automatically?

Yes. When a permit is created, the system automatically checks whether the assigned workers hold the required, valid authorisations. A person who lacks an authorisation is not silently added to the permit: the gap is visible when the permit is requested, while the crew composition can still be changed.

The same rule applies to external companies. The request of an external company and a permit issued to a contractor form one permit, visible on both sides. The client and the contractor therefore do not exchange attachments by email; they look at the same document.

It is also worth knowing how this looks on the contractor's screen. A green colour and the label Working mean only admission to the main work. A team that is still waiting for preparatory tasks sees an amber call to action, so waiting is not mistaken for a green light.

How does an access card swipe reach the register, and what about duplicates?

InnerWeb receives card swipe events from the access control system through an HTTPS message initiated by the plant's site on port 443. No inbound ports need to be opened in the plant network. Authentication uses a technical account and a token with limited validity, renewed automatically by the integration.

The integration specification assumes that the access control system sends events in real time, with the event time from the reader, the direction (entry or exit), the reader identifier, the person, the card number and an event identifier. The rules for pairing entries with exits and for rejecting duplicates are agreed in the specification with the access control vendor, so that a double swipe at a gate does not create a false entry.

The integration requires no replacement of cards or readers. Three things remain to be agreed with the access control vendor: whether the system can send HTTPS POST, which reader list means entry and which means exit, and how cards are exported.

What to do when the access card is valid but there is no permit?

The decision belongs to security and the facility manager, but the system gives them a clear basis. If the verdict at the scan shows no permit, the engineer is not admitted to the work zone until a permit is requested and approved. Entry to the general site and entry to the work zone are two separate decisions.

For unmanned facilities, where nobody stands at the gate, it makes sense to require a badge scan at the engineer's entry and a permit opened in advance. A missing permit then shows in the register as an entry without coverage, which the coordinator can explain on the same day.

Every change to permits, the taxonomy of hazardous work and training results is saved with author and time. When a dispute needs explaining, it is known who approved what and when.

Does the access card help in an evacuation if there is no badge scan?

The evacuation list is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups, including external companies and people whose status is uncertain. Swipes from the access control system feed the attendance register, so people who entered only with a card do not disappear from the attendance picture.

At small distributed sites the number of people is low, but the rule is the same: the fewer entries that pass outside the register, the fewer people in the uncertain category. It is worth agreeing with the access control vendor which readers send events, because a reader left out of the configuration is an entry invisible to the list.

Checklist

Video

Frequently asked questions

Does InnerWeb replace readers or cards in the client's access control system?

No. InnerWeb is a manufacturer of software and industrial beacons and does not make access control readers. It integrates with the client's existing access control system and takes card swipe events from it.

Do inbound ports need to be opened in the plant network?

No. The swipe message is sent from the plant system over HTTPS on port 443, so there is no need to open inbound ports. Authentication uses a technical account and a token with limited validity, renewed automatically.

What happens if the controller sends the same swipe twice?

The rules for rejecting duplicates are set in the integration specification with the access control vendor. The system sends an event identifier, so that resending the same event is recognised and not recorded as a second entry.

Does a QR badge scan replace the work permit?

No. The scan records the entry and shows a verdict, including whether a permit is in progress, but the permit itself is a separate document for a specific job. The scan and the permit complete each other in the register.

Check how the access card links to the work permit