Why the paper logbook stops being enough
At one site, an entry logbook works well. At forty sites it becomes a problem: each one is kept in a different place, the entries are hard to read, and after an incident nobody can quickly say who was at a pumping station in a given week. For the utility, it also matters to have proof that the entry had a basis, meaning valid training and a permit.
A digital register solves three problems at once: it is one register, searchable and linked to permissions. On the condition that the rules for keeping it are simple and suit fieldwork.
Practice 1: let the scan be the entry
A scan of a QR badge or an RFID card records the entry and gives a verdict on whether the person may be on site. There is no separate manual entry to complete. This is the most important change: the technician does not keep the register, the register is produced by the entry itself.
At sites with existing access control, card swipes can be received from the KD system, and at the others a QR code at the gate or door can be used. The place where both paths meet is the register.
Paper and digital register: sample calculation
- Paper logbook
- Digital register
Practice 2: assume there is no connectivity
Actions that change data in the field without Wi-Fi are queued locally in the device's browser and replayed once the network returns. The backend recognises repeats, so resending does not create duplicates. It is therefore possible to set the rule that the register is completed after the visit without any action by the employee.
It is still worth settling what the technician does after returning to coverage: they open the application and check whether the queue counter has returned to zero. If it has not, they report this to the dispatcher. Without such a step, gaps may only come to light during an audit.
Practice 3: link the register to the permit and qualifications
The register of entries is all the more valuable the easier it is to match it with the permit. When a permit is created, the system automatically checks whether the assigned workers hold the required, valid qualifications. On the entry side, it is enough to compare the scan with the permit for the day.
For external companies, the request and the permit issued to the contractor work on the same permit, visible on both sides. The company sees the same thing as the utility, so disputes over whether an entry was agreed are rarer.
Practice 4: the change log as part of the register
The register of entries says what happened at the site. The change log says who changed the rules. Changes to permits, the taxonomy of hazardous work, training results, automation rules and inspection routes are saved with their author and time.
During an internal or external inspection, the two documents together give the full picture: the rules, the entries and any deviations.
Practice 5: order the sites in one structure
The register is useful when the sites have a stable, understandable layout: area, site, element. Documents, audio and video are assigned at every level of the plant hierarchy with inheritance down the tree, so an instruction for a whole group of pumping stations does not have to be copied to each site.
It is worth settling the structure before the first entries appear in the system. A later change of layout is possible, but it makes comparisons over time harder. We describe this on the page about mapping the structure of water network sites.
Indicator to monitor: the share of entries with a permit
One number says more than five reports: the share of entries for which a permit or an entry in the work plan existed. The utility can calculate it monthly for the whole network and separately for external companies. Set the target value after the first quarter, not in advance. Figures from the first weeks mostly show gaps in habits, not in the system.
Assumptions of the before and after example
| Parameter | Value |
|---|---|
| Number of sites | 40 sites |
| Manual entry in the logbook | 2 min per entry |
| Finding an entry in scattered logbooks | 45 min per event |
| Search in the digital register | 3 min per event |
Result: The time for an entry at the gate falls from 2 minutes to 0, because the scan is the entry; finding the entry after an event falls from 45 to 3 minutes.
Note: Sample calculation on the utility's own assumptions; actual times depend on the utility.
Checklist
Video
Frequently asked questions
Does the technician have to enter anything by hand?
No. The scan at the gate is a control act and records the entry.
What if the site has no Wi-Fi?
Actions are queued locally on the device and replayed when the network returns. Resending does not create duplicates.
Does the entry register replace the permit?
No. The register shows the actual entries, while the permit allows the work to go ahead. Their comparison is what gives the value.
Who can see the register?
People with the appropriate permissions on the utility's side. The external company sees the same permit as the utility.
Let's start with one register
We will show what the entry register of your sites would look like and how it behaves when there is no coverage.
Let's talk