Before you start: what must be ready
Badge login has three prerequisites: a badge with a QR code, a tablet with a camera, and the system address in a secure HTTPS context. A QR scanner in the browser requires HTTPS; an installation served over plain HTTP under an IP address will not start the camera.
The same badge QR code serves four purposes: gate control, an e-mail invitation, control in the hall and login to training on a tablet. A badge printed once therefore serves several processes.
Step 1: prepare the tablet and the HTTPS address
Place the tablet in a fixed holder, in a spot with even lighting and no light falling directly on the lens. Open the system address over HTTPS and check that the browser asks for camera permission. Permission is granted once per address.
The tablet camera uses the browser's native barcode detector, and when it is missing, a library loaded from the system's own server, not from an external CDN network. The plant firewall rejects such traffic without any message, so a test on the plant network is mandatory.
Step 2: check the error messages
The system shows one of four separate messages when the camera does not work: no permission, no camera, insecure context or no support. Before the start, check each of them: refuse permission, cover the camera, open the address over HTTP and check a browser without scanning support. Knowing what each message looks like shortens later conversations with technical support.
- no permission: the browser did not get permission for the camera
- no camera: the device does not have one or it is blocked
- insecure context: the address is not over HTTPS
- no support: the browser does not support scanning
Step 3: the identity confirmation screen
The scan does not log in on its own: the screen shows the first name, last name and company of the code's owner, and the training starts only after a person confirms it. The badge may lie on a table or end up with someone else, so the confirmation is a deliberate step, not a formality.
When the training screen was opened from a badge, the form for choosing a company and typing a login is not displayed at all, including when the code was not recognized. In that case a message and a button for rescanning appear. Rehearse this on three cases: a valid code, an unknown code and someone else's code.
Step 4: entry from the worker's own phone
The worker can do the same on their own phone. A phone that scans the code with its camera opens the address with the badge token without installing any app, and the token goes to the training screen as an input parameter. The tablet is therefore needed for people without a phone or without consent to use a private device.
Only people in transitional roles may take the induction training on the tablet by themselves: supplier, courier and visitor. Plant employees and external contractors enter through an invitation or the registration module, so they should not be directed to the tablet at the gate.
Evidence for the audit
After the training the plant has a record of the identity confirmation, the test result and the language of the material. It is worth reviewing once a month the number of unrecognized scans and camera messages: a high number means damaged badges or a lighting problem on the tablet.
Checklist
Video
Frequently asked questions
Why doesn't the tablet camera work over HTTP?
The QR scanner in the browser requires a secure HTTPS context. Over plain HTTP under an IP address the camera does not start, and the system shows the insecure context message.
Does a scan start the training right away?
No. The screen shows the first name, last name and company, and the training starts after a person confirms it.
Who can train on the tablet by themselves?
People in transitional roles: supplier, courier and visitor. Plant employees and external contractors enter through an invitation or the registration module.
Launch badge login on your tablet
Book a call: we will go through the HTTPS address, the tablet camera and the identity confirmation screen together.
Let's talk