QR scan instead of login: time calculation at the gate and tablet

Manually finding an account, meaning choosing a company and typing a login, takes on average about 90 seconds per person, and a badge scan with confirmation about 15 seconds. These are working values that the plant replaces with its own measurement. Below is a sample calculation with explicit assumptions, which can be recalculated for your own number of people.

90 s
manual finding of the account (working assumption)
Source: calculation assumptions card
15 s
badge scan with confirmation (working assumption)
Source: calculation assumptions card
250 min
saved per day with 200 logins
Source: sample calculation

What makes up the time of manual login

Manual login on the training tablet has several steps: choosing a company from a list, typing a login, possibly correcting a typo and confirming. On a tablet, in gloves or in a queue behind other people, each of these steps takes longer than at a desk.

We assume a working value of about 90 seconds per person. It is an assumption to be replaced by a measurement in the plant: it is enough to time a dozen or so logins with a stopwatch at different times of the day and average the result.

What makes up the time of a badge scan

A badge scan covers showing the code to the camera, recognizing the owner and confirmation by a person. The scan does not log in on its own: the screen shows the first name, last name and company of the code's owner, and the training starts after confirmation. This step costs a few seconds, but it is necessary, because a badge can lie on a table or end up with someone else.

We assume a working value of about 15 seconds per person. When the training screen was opened from a badge, the form for choosing a company and a login is not displayed at all, including when the code was not recognized. In that case a message and a button for rescanning appear, so a wrong scan does not return to manual typing.

Total login time per day, 200 people

Total login time per day, 200 peopleBefore and after chart: 300 minutes a day with manual login, 50 minutes with a badge scan.0100200300minChoosing company and login: Daily time: 300 min300 minChoosing company and loginBadge scan: Daily time: 50 min50 minBadge scan
Source: Sample calculation: 200 logins a day, 90 s manually, 15 s with a scan

Cost of implementation and time savings

The same badge QR code serves four purposes: gate control, an e-mail invitation, control in the hall and login to training on a tablet. This means that a badge printed once serves several processes, and its cost is not assigned only to login.

Additional costs on the plant side are printing the badges with the code, a tablet with a camera and an HTTPS address, because a QR scanner in a browser requires a secure context. Prices depend on the number of stations and equipment, so we give them only as indicative ranges from implementations in 2025 and 2026; individual quotation.

How to recalculate it for your plant

The calculation has three variables: the number of logins per day, the manual time and the scan time. The daily saving is the number of logins multiplied by the difference in times, divided by 60, which gives minutes. The monthly saving is the daily result multiplied by the number of working days.

Remember that time saved at the gate does not always translate into a labor cost. Most often it means a shorter queue, less crowding at the tablet and fewer calls for help to the staff. The monetary value depends on whether the saved worker time is productive or is simply waiting time.

  • measure the manual time and the scan time at your plant
  • count daily logins from the system log, not from an estimate
  • separate the time saved for workers from the time saved for staff
  • take seasonality into account: turnover and downtime increase the number of logins

What the calculation does not cover

The calculation does not cover logins to the wrong account or the time needed to correct them. A badge scan with confirmation reduces this risk, but does not replace human control. It also does not cover people without a badge: for them the manual route remains, or a badge is issued at the gate.

Example calculation

Sample calculation: 200 logins a day

Assumptions
ParameterValue
Number of logins per day (gate and tablet)200 people/day
Time of manual finding of the account90 seconds
Time of badge scan with confirmation15 seconds
Working days in a month22 days

Result: Manually: 200 x 90 s = 300 min a day. With a scan: 200 x 15 s = 50 min a day. Saving: 250 min a day, which is about 5,500 min (about 92 hours) a month.

Note: Sample calculation on working values; the plant replaces them with its own measurement. It is not a promise of monetary savings.

Video

Frequently asked questions

Are the 90 and 15 seconds measured data?

They are working values for the calculation. The plant should replace them with a measurement at its own station, because the time depends on the equipment, the gloves and the queue.

Does the badge scan completely rule out typing a login?

When the screen was opened from a badge, the form for choosing a company and a login is not displayed, including when the code is not recognized. In that case a message and a button for rescanning appear.

What are the costs of implementing the scan?

They depend on the number of stations, tablets and badge printing. We give only indicative ranges from implementations in 2025 and 2026; individual quotation.

Measure the login time at your plant

Book a call: we will recalculate the model for your number of people and help you measure manual time on a tablet at the gate.