What the two numbers 15 m and 39 m mean
The average deviation of 15 m means that a typical result lies within a radius of a dozen or so metres from the real position. The maximum deviation of 39 m describes the worst observed case in this simulation. Both numbers concern transmitters placed every 100 m, the density used along plant roads. Inside buildings a denser grid is used, 1 transmitter per 100 to 200 m2, so smaller deviations can be expected in halls, but only a measurement after installation confirms it.
For the dispatcher the maximum value matters more than the average. The rescue procedure has to work even when the result is least accurate. That is why the search area is set by the maximum deviation, not by the average.
How to turn the deviation into a search area
A circle with a radius of 15 m has an area of about 707 m2, and a circle with a radius of 39 m has an area of about 4,778 m2, almost seven times more. This is the difference worth showing the shift manager: in the worst case, rescuers do not search one workstation hall, but a considerable part of the neighbouring space.
In practice the search area is narrowed by context the dispatcher should not ignore. The worker is not in empty space, but on a route, at a workstation or on the level where, according to the assignment, they were supposed to work. Combining the position with the assignment, the zone and the last known direction of movement narrows the area more than the deviation figure alone.
- average 15 m: area about 707 m2,
- maximum 39 m: area about 4,778 m2,
- ratio of areas: about 6.8 times.
Search area depending on the deviation
How the SOS alarm works and what the dispatcher sees
The SOS alarm on the watch is triggered by a triple press or a long press of the button, with a three-second countdown to cancel. The countdown reduces false alarms without slowing the reaction in a real situation. The online map plays a sound when a new SOS alarm appears, so the dispatcher does not have to watch the screen constantly.
The second channel is detection of inactivity: no reaction from the worker within a configurable time window starts an escalation, and the team is notified in less than 2 minutes. For a worker who cannot press the button, this is the only mechanism that will bring help.
The dispatcher procedure after an alarm, step by step
The sequence below is a proposal to be adapted to the plant's instructions and does not replace rescue procedures.
In a steelworks the surroundings are especially important: overhead cranes, internal transport and liquid metal make the lack of an answer to the question of who the person is and where they should be a direct risk. That is why the procedure starts with confirming identity and assignment, and only then with pointing to a place on the map.
- confirm who raised the alarm and what assignment they had on the shift,
- read the position and mark on the map an area with a radius equal to the maximum deviation,
- send rescuers to the centre of the area and at the same time to the most likely places according to the assignment,
- open the evacuation list if the event requires leaving the zone,
- record the time of the alarm, the time of arrival and the difference between the position and the place where the person was found.
How to reduce the deviation in critical cases
The deviation is reduced by the density of transmitters in zones of greatest risk. Instead of a uniform grid, it is worth placing more points near cranes, rails and transport routes, and fewer in quiet places. The range in steel structures is verified by measurement after installation, and the result is attached to the acceptance protocol.
The second way is data discipline: a transmitter recorded in the wrong place distorts the position. That is why, after rebuilding a hall or moving a crane, it is checked whether the transmitter positions in the database match reality.
Checklist
Video
Frequently asked questions
Is 15 m enough for an effective rescue?
It is enough to narrow the search, but it is not an address. The dispatcher sets the area by the maximum deviation and combines the position with assignment data.
Do the figures apply to a hall?
They apply to a simulation with transmitters every 100 m, that is the grid of plant roads. Halls use a denser grid, and the result is confirmed by measurement after installation.
How do you trigger SOS on the watch?
With a triple press or a long press of the button, with a 3-second countdown to cancel.
What if the worker cannot press the button?
Inactivity detection works: no reaction within the configurable time window starts an escalation, and the team is notified in less than 2 minutes.
Let's rehearse the SOS alarm on your map
Invite InnerWeb to a joint review of the dispatcher procedure: search area, SOS, inactivity and the evacuation list.
Let's talk