InnerWeb
Skip to main content

Position averaging: locating an employee without GPS

The InnerWeb system does not trust a single reading. The position of an employee results from the signals of several beacons, averaged on the map, and it works without GPS. A safety manager who has to assess a point on the map should know how many readings stand behind that point and when their number is too small. Below is a step-by-step description.

4
maximum number of readings in the average
Source: spec sheet
5
minimum number of beacons for a 3D position
Source: spec sheet
40 s
history in the window with a heartbeat every 10 s
Source: illustrative calculation

Why GPS is not enough in a plant

GPS needs a view of the sky. Inside halls, under canopies, in high-bay warehouses and on building floors, reception is weak or impossible, and even when it works, it cannot tell floors apart. That is why location in a plant is based on beacons placed at known positions.

The advantage is independence from satellite coverage, and the price is the need to plan the density of transmitters: plant roads about every 100 m, and inside a building one transmitter per 100-200 m².

Where the position comes from

The worn device sends a heartbeat cyclically. Its content includes the list of beacons the device hears, the signal strength from each, the battery state and the status. From such a packet the system determines where the employee most likely is.

Step 1: normalization and averaging of power

Signal strength is normalized and averaged over a maximum of four most recent readings, so that a single disturbance does not move the point. The window is deliberately short: it is meant to smooth noise, not to delay the picture of movement.

Step 2: selecting the location

In the simpler mode, the system selects the nearest location based on signal strength, that is it gives the name of a place such as a gate, a hall or a warehouse. This mode is robust and is sufficient when the plant wants to know which area someone is in.

Step 3: three-dimensional position

The 3D mode calculates the position with an evolutionary algorithm and requires readings from at least five beacons. If the device hears fewer transmitters, the system should not pretend to be accurate and stays with the simpler indication of the place.

Required number of beacons by mode

Required number of beacons by modeHorizontal bar chart: the nearest location mode needs 1 beacon, the 3D mode at least 5.012345pcsNearest locationNearest location: 1 pcs13D position3D position: 5 pcs5
Source: Documentation of the Location, Heartbeat & Auto-Close function: nearest location mode and 3D mode (minimum 5 beacons)

How many readings and transmitters are enough

Two figures matter to the practitioner: the averaging window (at most 4 readings) and the threshold for a 3D position (at least 5 beacons). The first limits noise, the second conditions reliability in three dimensions.

Example calculation: if the device sends a heartbeat every 10 s (assumed value), a window of four readings covers about 40 s of history. Under this assumption, an employee walking briskly covers more than 40 m in that time, so with a changing position the heartbeat frequency matters too, not just the window. The frequency is set during the pilot, together with the plant.

When to trust a point on the map

A point is reliable when several beacons are heard at the same time, their power levels are consistent with the position, and there are no reports of interference. A single point with no neighbours in the history should be treated by the safety manager as an indication of an area, not as an address.

Work on floors and georeferencing

In multi-storey buildings a horizontal position alone is not enough: the system must know which floor the employee is on. That is why several beacons on each floor are a requirement, not an extra. A hall in the system can also be georeferenced, meaning it has an anchor point, rotation and scale, which allows the plant map to be overlaid on an orthophoto of the site.

From an audit perspective, it matters that averaging is repeatable: the same readings give the same result. The supplier should provide a description of the algorithm and the input data for disputed events.

How to check position quality in the pilot

Mark several control points of known position, walk through them in sequence with the device and compare the path with the expected one. Record how many readings and how many transmitters were used at each point. Only such a record shows whether the density of the layout is sufficient, rather than an impression from the map.

A good practice is to repeat the control route after changing the layout of racking or after adding transmitters. The result of the previous measurement then becomes the reference point, and the safety manager sees whether the change improved coverage or only moved the problem to another place in the hall. Recorded results are also useful during an audit, because they show that the accuracy assessment rested on repeatable measurement.

Checklist

Video

Frequently asked questions

Is a position without GPS less accurate?

Inside buildings and under a roof GPS usually fails, so beacons at known positions are a more stable source. Accuracy depends on the density of the layout and the radio environment.

Is 4 readings a fixed limit?

It is the maximum number of most recent readings averaged in normalizing signal strength. The window is deliberately short so that the position keeps up with movement.

What if the device hears fewer than 5 beacons?

A 3D position is then not calculated. The system stays with the simpler indication of the nearest location.

See the position on your plant map

We will prepare a measurement in one hall and show the readings, the averaging and the result, so you can judge how far to trust a point on the map.

Let's talk