InnerWeb
Skip to main content

3D Position in a Building: Minimum Number of Beacons

The 3D mode in the InnerWeb system requires readings from at least 5 beacons at the same time. In a multi-storey building this condition may be met on one floor and not on the next, which is why the beacon layout is planned floor by floor, not just by area.

5
minimum beacon readings for the 3D mode
Source: karta
4
last readings averaged for signal strength
Source: karta
100-200 m²
floor area per beacon in a building
Source: karta

What the minimum of five readings really means

The heartbeat of a wearable device carries the list of beacons it hears and the signal strength of each one. The system has two ways of calculating a position. The simpler one selects the nearest location based on signal strength. The 3D mode calculates a three-dimensional position with an evolutionary algorithm and requires readings from at least 5 beacons.

The number five refers to readings within a single cycle, not to the number of beacons in the whole building. A beacon mounted on the ground floor whose signal goes through the ceiling and reaches the first floor counts as a reading, but with low strength, so it contributes little to the position. That is why, in the design, we count the beacons that the employee hears clearly, not all those that could theoretically reach.

Base density versus the three-dimensional requirement

The base recommendation for a building is one beacon per 100-200 m² of floor area. For a room of 400 m² this gives 2 to 4 beacons, which is fewer than 5. Base density is therefore enough to determine in which room or on which floor the employee is, but not a full 3D position.

The practical conclusion: a three-dimensional position inside a building is a decision about beacon density, not a setting in the configuration. If the information of the type hall, floor, room is sufficient for a given area, we stay with the simpler mode and save beacons. If the dispatcher needs to see at what height a person is working, for example on a mezzanine or a platform, we densify the layout only in that area.

Beacons per 400 m² room versus the 3D mode threshold

Beacons per 400 m² room versus the 3D mode thresholdBars compare the 3D mode threshold (5 beacons) with the number of beacons resulting from base density for 400 m²012345pcsRequired for 3D: 3D mode threshold: 5 pcs5 pcsRequired for 3DBase density: 1 per 200 m²: 2 pcs2 pcsBase density: 1 per 100 m²: 4 pcs4 pcsBase density
Source: Calculation from the density recommendations and the threshold in the site card

Vertical layout: beacons on several floors

In a multi-storey building the algorithm needs reference points distributed also vertically. Five beacons lying in one floor plane will position the person correctly on the plan, but will poorly distinguish the height. Good practice is to place the beacons alternately on two levels (above doors and near the ceiling, or on different floors), so that an employee on any floor hears beacons also from the floor above or below.

The floor selector on the map (ground floor, 1, 2 and so on) shows the floors, so the beacon layout is designed together with the plant structure editor: building, number of floors, equipment. The difference between floors is then visible on the map without additional configuration.

  • Staircases and shafts: a beacon on each half-landing stabilises the transition between floors.
  • Reinforced concrete slabs attenuate the signal more strongly than partition walls, so for a slab we count on a smaller vertical range.
  • Beacons are mounted on permanent structural elements, not on equipment that gets moved.

What to do on a floor where fewer than five are heard

When the measurement shows that on part of a floor the employee hears 3 or 4 beacons, you have three reasonable options. First: add beacons in that area, if the 3D position is needed operationally. Second: leave that area in the simpler mode, which shows the nearest location, and describe this explicitly in the instructions for the dispatcher. Third: move the existing beacons closer to the centre of the area instead of placing them along the walls.

We do not recommend switching off individual readings or lowering thresholds to formally reach five. A position calculated from readings of very low strength is less reliable than an honest indication of the nearest location. Before the decision, it is worth collecting data from several working days, because the number of beacons heard changes with the time of day and the occupancy of the hall.

Averaging and position stability

The signal strength (RSSI) is normalised and averaged over at most the last 4 readings, which limits position jumps. In a building with many floors the averaging effect is especially important, because a single reading reflected from a metal structure can momentarily move the employee to another floor on the map.

If the position still jumps despite averaging, first check the list of beacons saved in the area, and only then the algorithm parameters. A typical cause is a beacon recorded in the system in the wrong location, or two devices with the same identifier.

Order of steps during implementation

We recommend the following sequence: building plan and number of floors in the structure editor, preliminary layout at 1 beacon per 100-200 m², measurement of audibility on every floor under real occupancy, a decision per area (simple mode or 3D), adding beacons only where 3D is required, a test of passage through the staircase, and verification on the map by double-clicking the employee who opens the building on the correct floor.

Video

Frequently asked questions

Do 5 beacons have to be on every floor?

No. The five readings refer to a single measurement cycle for the employee, so they may also come from the adjacent floor. In the design, however, only what the employee hears clearly is counted.

What if a 3D position is not needed?

You stay with the simpler mode, which indicates the nearest location based on signal strength. It is sufficient for floor and room information.

Can I combine both modes in one building?

Yes. The per-area approach is sensible: you densify only the places where working height matters, for example mezzanines.

Let's talk about the beacon layout at your plant

We will show the map, the readings and the configuration on your site plan. Book a short conversation with the InnerWeb team.

Let's talk