Before you start: what a missing heartbeat means
From the heartbeat, the system knows the employee's position in real time. On this basis operate the presence view on site, the automatic joining and leaving of a work permit, and safety signals such as inactivity. A missing heartbeat therefore means that this whole layer is no longer current for one person.
The signal loss function indicates employees from whom no heartbeat has arrived within a set time window. It provides service with the list to check, and the plant sets the window, taking into account the nature of the work: different in a warehouse than in a refurbishment shaft.
Order of checks step by step
This checklist assumes that service has access to the presence view and the device list. The order matters: the cheapest and most frequent causes are checked first.
1. Check the last known position and time
Open the last heartbeat: the last beacon, signal strength, battery level and time. If the last location was an entrance to a zone without beacons, the lack of signal is the explanation, not a fault.
2. Assess the battery level from the last packet
A low battery level in the last heartbeat suggests a discharge. It is worth checking whether the device was returned from the charger with an incomplete cycle. The charging state is inferred by the system from the battery trend, because devices rarely report it themselves.
3. Check whether other workers in the same area are transmitting
If all devices in the same zone have stopped transmitting, the problem lies in the infrastructure: beacon, gate or network. If only one device is missing, suspicion falls on the hardware or on the worker themselves.
4. Compare the formal layer with the heartbeat layer
The worker's status on a permit has two independent layers: the formal one (invited, joined), set by permit coordinators, and the one based on the heartbeat (working, has left the workplace). A missing heartbeat with the formal status joined is a discrepancy that must be clarified with the permit coordinator.
5. Contact the worker or their supervisor
A radio or phone conversation is the fastest way to establish whether it is an equipment fault. If contact fails and the worker is performing work with an elevated risk, the plant's procedure must provide for sending a person to the location.
6. Replace the device and record the event
After the replacement, check whether the new device transmits and is assigned to the correct worker. Record the time of loss, the time of restoration and the cause, because such data shows whether the problem concerns one unit, a batch or a zone.
Example structure of heartbeat loss causes
Consequences of a missing heartbeat for the work permit
When an employee leaves the workplace, the permit template has automatic closing enabled and all tasks are closed, the permit ends by itself. A missing heartbeat, however, is not leaving the workplace: the system should not close the permit only because the device has gone silent.
From the point of view of the health and safety manager, this means the signal loss procedure must be written down separately. It covers: the time window, the person who responds, the way of confirming that the worker is safe, and the record of the event on the permit.
How to reduce the number of reports
Most reports of a missing heartbeat come from a few sources: discharged batteries, devices left in a locker and zones without coverage. A weekly review of the device list with the largest number of gaps shows where to add a transmitter or change the charging procedure.
Example calculation: if a plant has 40 devices and in one shift 6 of them report a gap longer than the window, then 15 percent of the fleet needs checking. At 3 minutes per device, this is 18 minutes of service work per shift. These are illustrative assumptions, not data from a specific plant.
Checklist
Video
Frequently asked questions
How long without a heartbeat is an alarm?
The plant sets this window, depending on the risk of the work. For work with an elevated risk the window should be shorter than for a standard round.
Will a missing heartbeat close the permit?
No. Automatic closing concerns leaving the workplace when all tasks are closed, not the device going silent.
How do we know a device is charging?
The system infers it from the battery trend at the location of the multi-charger: if the level rises, it is charging; if it falls, the device has been taken off the charger.
Let's prepare the signal loss procedure
We will help you set the time window, the list of responding people and the service view, so that a missing heartbeat has a clear path of response.
Let's talk