Control points and the round route
The plant defines control points on the map, each with its own control list, and assembles them into round routes per department. As a result the leader does not plan the round from memory: they receive a route for their hall, with the points in a fixed order.
In a sawmill and a joinery plant the control points are usually located at extraction ducts, filters, sanders, saws, dryers and along vehicle routes. Each point has its own questions, so the list for a filter differs from the list for a packing station.
What to check at each point
The first check concerns dust: whether there is deposited dust on surfaces above foot height and whether it forms more than the normally visible layer. Dust settled on structures, beams and light fittings is fuel that can be ignited.
The second check concerns ignition sources: sparking elements, hot surfaces, damaged cables, hot work outside a permit, smoking and charging bays. In zone 22 a cloud of combustible dust does not occur during normal operation and, if it does, only for a short time, so every deviation requires a reaction.
- Dust deposits on structures, machines and light fittings.
- Condition of extraction ducts, filters and dust extraction lines.
- Sparking, overheating bearings and hot surfaces.
- Hot work and permits: whether every job has a document.
- Escape routes and access to fire extinguishers clear of obstructions.
What to do with a finding
Anyone logged in can report a hazard, a fault or an event that could lead to an accident, with the location from the plant dictionary, the type, a description and photos. The report goes to the team that takes it over and closes it. The leader does not have to remember whom to tell about the deposits at the filter.
Documents, instructions and recordings for a specific workstation are available in the library assigned at each level of the plant hierarchy (hall, area, line), with inheritance down the tree. The leader finds the instruction for their point without searching through folders.
Record and evidence
The round has value only if it leaves a trace: who did it, when, and which points were checked. The saved control list is evidence in case of an audit and material for discussion at the shift briefing.
A good practice is to review at the start of the shift the reports from the previous day and check which of them have been closed. A round after which nothing happens quickly loses its credibility.
Checklist
Video
Frequently asked questions
Who lays out the round route?
The plant defines the control points on the map with their control lists and assembles them into round routes per department.
Can the leader report a hazard with a photo?
Yes. The report contains the location from the plant dictionary, the type, a description and photos, and goes to the team that takes it over and closes it.
Where does the leader find the instruction for a point?
In the library assigned to the hall, area or line. The assignment is inherited down the plant hierarchy.
Sources
Let us set up the round routes for your halls
On a demo we will show control points on the map, control lists and reporting a hazard from the round.
Let's talk