InnerWeb
Skip to main content

Marking places and devices with QR codes in a plant

A QR code on a door, a machine or an assembly point makes sense only if it can be read in dirt and if, after the scan, someone knows what to do next. This guide shows how to choose the error correction level, the label size and the mounting place, and how to link the code with OHS and maintenance.

30%
of the code damage is restored at correction level H
13 mm
minimum size of a QR code on a system label
Source: karta
64
characters of the random token in the code
Source: karta

What a QR code on a place or device is for in a plant

A QR code on a door, a machine or an assembly point is an address that a phone or scanner turns into a specific action. For OHS it can be confirmation of presence at an assembly point, for maintenance reading the device history, and for security a check that someone was in a given place. Before you start printing, answer the question: who will scan this code and what should they see after the scan.

Choose a dozen or so places to start, not the whole hall. The best places for a pilot are those where a scan would already be useful today: entries to restricted zones, key machines with documentation, assembly points and emergency doors. After a few weeks the plant sees which labels are scanned and which are not, and can extend the marking where there is real traffic.

Remember that a code on equipment and a person's badge are two different things. A guest badge holds a token linked to a person, while a code on a door identifies a place. In the project it is worth distinguishing them by appearance and description, so that nobody confuses a door code with an identifier.

Error correction level versus dirt and scratches

According to the ISO/IEC 18004 standard, a QR code has four error correction levels: L restores approx. 7% of the codewords, M approx. 15%, Q approx. 25%, and H approx. 30%. The higher the level, the more damage the code can withstand, but the larger or denser it must be to hold the same address.

In a hall, where the label is exposed to dust, oil and scratches, we recommend level Q or H. In a clean office or on a corridor door, level M is enough. A higher level also makes sense for labels stuck on machines, because dirt there is daily and cleaning is not always possible.

Choose the correction level together with the size: there is no point in choosing H if the code is 13 mm and becomes too dense to read. Labels in the InnerWeb system have a code of at least 13 mm regardless of the format, and the permitted label size range is 13 to 233 mm. On machines and doors a clearly larger size is usually used, because the scan happens from a distance.

  • L approx. 7%: only clean, lightly used places
  • M approx. 15%: offices and corridors
  • Q approx. 25%: halls, warehouses, assembly points
  • H approx. 30%: machines, paint shops, places that get dirty

QR code error correction levels

QR code error correction levelsBar chart: level L approx. 7 percent, M approx. 15, Q approx. 25, H approx. 30 percent of recoverable codewords.0102030% of recoverable codewordsL: 7 % of recoverable codewords7LM: 15 % of recoverable codewords15MQ: 25 % of recoverable codewords25QH: 30 % of recoverable codewords30H
Source: https:/www.scandit.com/products/barcode-scanning/symbologies/qr-code

Size, height and mounting place

The code should be scannable from a natural position of the person, not from crouching or reaching. For a door it is eye level or handle height, for a machine the panel next to the controls, and for an assembly point a post or board visible from a few metres. The further the code is from the scanner, the larger it must be; the right size is set by a trial on site.

Stick the code on a flat, matt surface, away from edges, welds and places where tools rub against the label. Avoid glossy foil coatings that reflect the light of hall lamps. Before covering a whole hall, make a trial: several codes, different users, different phones and different times of day.

If the code is used for a gate or control, the scanner works like a keyboard. On a PL keyboard layout with Caps Lock on, or with the AZERTY country setting, the characters and letter case get distorted, so the parser converts the text to lower case and recognises the token with one rule shared by the server and the browser. In practice the plant does not need to watch letter case, but it is worth testing the scanner on the keyboard layout that is actually at the gate.

Security: the code must not reveal whether it is valid

A QR code with a token should contain a random value, not a sequence number or the name of a place. In the InnerWeb system the token has 64 hexadecimal characters from 32 random bytes, never a sequence number, identifier or date. As a result, neighbouring codes cannot be guessed, and printing one label does not reveal the rest.

The public address of the QR code redirects without checking the token and does not reveal whether the token is valid, revoked or invented. A person from outside who photographs a label and tries to copy it gets no feedback on which codes work.

For OHS and maintenance this has a practical meaning: a label on a machine can be read by anyone, but data after the scan requires logging in. The code identifies the place, and access to information depends on the role.

How to link the markings with OHS and maintenance

For each group of labels define what happens after the scan and who is responsible for it. Assembly point: recording the person's presence. Zone door: checking whether the person has a valid training. Machine: access to instructions and the history of inspections. Assigning responsibility prevents a situation in which codes hang on walls but nobody uses them.

Document the markings in a simple register: label number, place, correction level, size, date of mounting and date of the last inspection. Such a register is evidence for an audit and the basis for replacing damaged labels. Once a quarter, walk through selected points and check whether the codes still scan.

Checklist

Video

Frequently asked questions

Is a higher correction level always better?

No. A higher level requires a larger or denser code. On a small label level H can worsen readability, so it is chosen together with the size.

Can a code on a door be copied?

The address of the code does not reveal whether the token is valid, and the token is random, so guessing is impractical. Access to data requires a role in the system.

How often should the labels be checked?

Once a quarter at selected points, and after each renovation or cleaning of machines. A damaged label is replaced and recorded in the register.

Sources

We will plan the markings on your plant layout

Book a call about marking places and devices. We will show a pilot of a dozen or so points and the label register.

Let's talk