Qualifications required for work: how to set them up so the permit rejects the wrong crew

An OHS manager who enters the qualifications required for a type of work no longer checks them by hand for every permit: the system compares them at the moment the permit is created. Below is the order of configuration, from the inventory of qualifications to a test on a boundary case.

What the system checks when a permit is created

When a work permit is created, the system automatically checks whether the assigned workers hold the required qualifications. The check happens at the moment the crew is submitted, not only at the gate or at the start of work, so the error is visible at the stage when it is still easy to fix: by replacing a person or completing a document.

The change is noticeable for the OHS manager, who until now compared the list of people with the list of authorizations on paper. Now the comparison is done by the system, and the human role is to keep the register up to date.

Step 1: gather the qualifications in one place

InnerWeb keeps in one place the qualifications, medical checks and training results of workers, including workers of external companies. This is the starting assumption of the whole configuration: as long as authorizations lie in spreadsheets and binders, no rule has anything to draw on.

Start with the list of types of work that actually occur at the plant and assign to each the minimum set of documents. For work at height the entries will differ from those for hot work or work in confined spaces. Do not start with the full list of all possible authorizations, because the register will grow beyond what is needed.

  • list of types of work at the plant
  • minimum set of qualifications for each type of work
  • owner of the register on the OHS side
  • rules for entering documents of external companies

Steps of the qualification configuration

Steps of the qualification configurationHorizontal bar chart showing four configuration steps: gathering, assignment, warnings, test.01234stepGathering qualificationsGathering qualifications: 1 step1Assignment to the type of workAssignment to the type of work: 2 step2Expiry warningsExpiry warnings: 3 step3Boundary case testBoundary case test: 4 step4
Source: InnerWeb feature documentation, order of implementation

Step 2: assign qualifications to the type of work

Each type of work receives a list of required qualifications. When a manager creates a permit for such a type of work, the system checks all assigned people against this list. A missing valid document stops the permit at the stage of submitting the crew.

The rule is simple: the requirement belongs to the type of work, not to a specific person. As a result, a new person added to the crew is checked in the same way as the others, without changing any settings.

Classic or scenario training

A training can run in a classic form: materials before a test, including video and PDF, and one final test. In a scenario form the training consists of steps in which the material, random questions and the required number of correct answers form one unit. A failed step repeats a fragment of the material. The choice of the form affects how hard it is to obtain an entry in the register, not the rule of checking.

Where the pass is counted

The pass of a scenario training is evaluated on the server side, and the player does not receive the scoring of answers. The worker therefore cannot view the answer key in browser tools, and the register entry is reliable in an audit.

Step 3: enable expiry warnings

The system warns workers and employers before medical checks, trainings and documents expire, so that nobody learns about the lack of validity on the day of work. This step closes the gap that most often ends in a permit rejected at six in the morning.

Agree with the external companies who receives the warning and through which channel. It is best if it goes to the coordinator, not to individual workers, because the coordinator plans the staffing of the crews.

Step 4: test on a boundary case

Before launch prepare a test permit with one person holding a valid document, one whose document expires tomorrow and one without any document. Check whether the system reacts as written in the instruction. The boundary case shows whether the validity period is counted the way the OHS manager expects.

Save the test result as evidence for an audit. It supports showing that the plant controls qualifications in a repeatable way, although it does not replace the decision of the person admitting the worker to work.

Checklist

Video

Frequently asked questions

When does the system check qualifications?

When a work permit is created, at the moment the crew is submitted. This way the error is visible before the work starts.

Does the register cover external companies?

Yes. InnerWeb keeps the qualifications, medical checks and training results of workers, including those of external companies, in one place.

Does the system replace the person admitting the worker?

No. The system checks the qualifications, and the decision to admit to work is taken by the person designated in the plant instruction.