Admission rules checklist before go-live: training and authorization

Switching on the rule no valid training, no entry on a Monday morning without preparation ends in a queue at the gate and calls from production. The project manager can avoid this by going through ten checks before the start. Below is the list with comments on why each item matters.

55 min
window of grouped notifications per company
Source: karta

Why the first day is the most risky

On the first day the rule meets all the backlog at once. Workers who until now entered on the basis of a paper list appear at the gate with trainings of different validity, and the gate shows a verdict nobody was prepared for. If the entry threshold is too wide, the queue grows, and if it is too narrow, it blocks crews that hold valid documents.

The checklist reduces this risk by splitting the preparation into data, settings and people. Each group is checked by someone else, and the project manager collects the confirmations before the decision to start.

Data: trainings and validity periods

First establish which trainings are the mandatory induction. Extra trainings beyond the mandatory induction are not treated as required at the gate check, so their absence should not stop entry. A mistake in classifying a training is the most common cause of unnecessary blocks.

The second element is the validity period. With the configuration in which the OHS training result is valid for one year from the date of completion, the list of people with overdue training on the day of go-live is usually longer than expected. Review it in advance.

Split of checks before go-live

Split of checks before go-liveDonut chart: 3 data items, 3 settings items, 4 items about people.Data and validity periods: 3 items (30%)Language and alarm settings: 3 items (30%)People and instructions: 4 items (40%)10itemsData and validity periods3 items (30%)Language and alarm settings3 items (30%)People and instructions4 items (40%)
Source: Layout of the checklist on this page: 10 items in three groups

Settings: language and alarm

The language chosen at registration determines the language of the training, and when a version in that language is missing, the gate requires the training in Polish. Check therefore whether trainings exist for the languages in which external companies work. Otherwise foreign crews will be directed on the day of go-live to a version they do not understand.

Test the alarm path as well. When a worker without valid training is scanned, the system creates an alarm permit and notifies the coordinator of the company. Notifications are aggregated in a 55 minute window, so the coordinator does not get ten separate calls, but they must have a current number.

People: security and coordinators

The guard must know what each element of the verdict means and how to proceed when it shows a gap. The gate records the entry at every scan, so the events from the first day will be in the history. Prepare a short instruction and run a trial on a few sample badges.

Coordinators of external companies should receive information in advance: which rule starts to apply, from when, how to check the status of a worker and where to receive the notification. It is best to send it two weeks earlier and repeat it in the last week.

The go-live decision

The rule starts when all items on the list are ticked and the list of people with backlog is short and known to the coordinators. If any item is still open, consider starting on one gate or on one shift.

After the start plan a review after the first day and after the first week. The first shows configuration errors, the second organizational problems on the side of the companies.

Checklist

Video

Frequently asked questions

Do extra trainings block entry?

No. Extra trainings beyond the mandatory induction are not treated as required at the gate check.

What happens to a worker without training?

The system creates an alarm permit and the automation notifies the coordinator of their company.

Is it better to start on one gate?

Yes, when the list of open items is long. Starting on one gate or shift limits the effects of any configuration errors.