Why a hygiene training for guests
The BRCGS hygiene requirements for packaging cover guests and contractors too: protective clothing, hygiene rules and site safety. A paper leaflet handed out at the gate house is easy to miss for a courier who is in a hurry to unload. A short training at the kiosk, with a confirmation, gives the plant documented proof that the guest learned the rules.
The training does not replace the assessment of the certification body. InnerWeb does not own the BRCGS standard and does not certify plants: the system provides the register and the evidence for the audit, while the assessment of compliance belongs to the certification body.
Step 1: who can join on their own
Only transitional roles can join the training on their own: supplier, courier and guest. Employees enter through an invitation, so the kiosk does not become a back door for people who should be invited. Set in the plant which roles see the kiosk training, and assign the right material to them.
A courier who has never been here
The courier approaches the kiosk, chooses their role and goes through a short material. The training should be short enough not to hold up the queue of vehicles, and built so that the key hygiene rules come first.
A visitor invited earlier
A guest invited by an employee enters with the code from the invitation, which also serves as proof of identity when the declaration is confirmed. The training and the declaration therefore share one unambiguous point of identification.
Step 2: languages of the material and the test
The kiosk training system runs the material and the test in Polish, English, Ukrainian and Russian, with the person identified before the training starts. In a packaging plant that serves drivers from several countries this matters: an instruction in a language the guest does not understand does not do its job.
The declaration text is shown in the language of the person's account, and after a card or badge is recognised the interface switches to that person's language. The plant enters the text in the panel and may add a separate English version for accounts in a language other than Polish; an empty English version means the Polish text is used.
Step 3: the declaration in the training path
The health declaration can be signed as part of the training on a phone or at the kiosk, which is one of the five channels. Confirmation on the public training path requires proof of identity: the code from the invitation, an active badge or an active card of that person. The account identifier alone is not enough.
After a correct passage through the training and the declaration the guest may enter. If the declaration is missing, the entry is not recorded in the register, and the reason for refusal appears in a fixed order: inactive account, missing health declaration, missing training, missing qualifications, expired permit, no permit or visit.
- Choice of role: guest, courier or supplier.
- Identification: code from the invitation, badge or card.
- Material and test in the chosen language.
- Health declaration and confirmation.
- QR badge and entry to the site.
Step 4: the evacuation list and groups
Hygiene training is also linked to safety. The evacuation list shows who is on site now, divides people into six groups including guests and suppliers, and refreshes every 13 seconds. In this way guests who passed the kiosk training are visible to security in case of an alarm.
Registering a guest at reception creates an external account with an identification number and prints a QR badge in one step. In a packaging plant the kiosk and reception complement each other: the kiosk serves guests who arrive without prior contact, and reception serves invited guests.
Checklist
Video
Frequently asked questions
Can an employee join the kiosk training on their own?
No. Only the transitional roles join on their own: supplier, courier and guest. Employees enter through an invitation.
In which languages is the training?
The material and the test are available in Polish, English, Ukrainian and Russian, with the person identified before the training.
Does the training replace the BRCGS audit?
No. The system provides the register and the evidence for the audit, and the assessment of compliance is issued by the certification body.
Sources
See the guest kiosk in action
We will show the training, the declaration and the badge in four languages on a demo kiosk.
Let's talk