The trace from invitation to exit
A visitor log is reliable when each event has its entry and the entries link into the history of one person. Registration at reception creates an external account with a registration number and prints a QR badge in one step, so the start of the trace is created without extra rewriting of data.
The next links are the health statement, the entry and the exit. With the option on, an entry without today's statement is not saved, so the log contains no entries without a statement.
Practices for the hall and the gate
The practices below concern how the process is set up, not the equipment. InnerWeb integrates with the plant's devices and does not replace them.
- One log instead of several: invitation, badge, statement and entry in the same system.
- One statement entry per person per day, with the channel and the confirmation time.
- A QR badge issued at registration and required at every entry.
- Exit always possible, also without today's statement.
- A list of people on site available to the security staff and the shift manager.
Sample number of guests on site during the day
The evacuation list as part of hygiene and safety
The evacuation list shows who is on site now, divides people into six groups, including guests and suppliers, and refreshes every 13 seconds. For hygiene this has a practical effect: the shift manager sees how many guests are in the plant and can decide how to deploy them.
The statement applies only to entry. A person already on site can always leave, so they do not remain on the evacuation list until the automatic night exit. A log practice that blocked exit would falsify the list at the moment it is most needed.
Reviewing the log before the audit
Once a month it is worth a trial review: pick several guests from recent days and find their full trace. If any link is missing, that is a signal to improve the process, not to add data after the fact.
The standard requires control of personnel health, and the hygiene requirements cover visitors and contractors too. The visitor log is one of the pieces of evidence that the plant meets this requirement. InnerWeb provides the log and the trace, and the assessment of compliance is made by the certification body.
Events for the quality team
Reception events, such as a registered guest and a guest entering the site, can be sent to the team's channel in a messenger through a setting with a webhook address. The quality team learns about the visit before the guest reaches the hall, and can prepare protective clothing.
This information does not replace the log, it complements it: the record in the system remains the only source of evidence, and the message in the messenger is a notification.
Checklist
Video
Frequently asked questions
How often is the list of people on site refreshed?
The evacuation list refreshes every 13 seconds and divides people into six groups, including guests and suppliers.
Does a messenger replace the log?
No. A message in the team's channel is a notification, and the evidence remains the record in the system.
What should I do if a link is missing in a guest's trace?
Fix the process that skipped it. Do not add data after the fact, because that weakens the credibility of the log.
Sources
See the visitor log from the inside
We will show a guest's trace from invitation to exit and the list of people on site.
Let's talk