InnerWeb
Skip to main content

Dispatcher oversight of deliveries on the online map: best practices

On the online map the dispatcher sees every vehicle with a locator, but only some of them need attention. The practice is to tell at once the deliveries with navigation for a driver from abroad, the deliveries under special supervision and the ordinary ones, and to recognise a stop outside the designated spot.

60 s
time after which a series of readings in one place counts as a stop
Source: route preview functions sheet
3 s
refresh interval of route points with the vehicle position
Source: route preview functions sheet

Three colours on the map, three kinds of attention

The online map marks the vehicle with navigation for a driver from abroad in red, the vehicle under special supervision in black, and the ordinary vehicle in white. The markings are set by security at the delivery locator when it issues the device to the driver.

The dispatcher does not have to read labels. It is enough to know what each colour means and to agree for each of them what to do when the vehicle stops in an unexpected place.

  • Red: the driver is guided by voice, check whether he is heading to the right warehouse
  • Black: delivery under special supervision, react to every departure from the route
  • White: ordinary delivery, attention only for a long stop

How the system recognises a stop

A stop in the route preview is a series of readings in the same location lasting longer than 60 seconds. A gap in the signal longer than 89 seconds ends the stop. This second threshold matters in practice: the lack of signal is not proof that the vehicle is standing still, so the system does not add to the stop the time in which there is no data.

The dispatcher should know this, so that a sudden silence is not read as a stop. When a locator stops transmitting, check the gate, because the problem may lie with the battery or with coverage.

Time thresholds of supervision on the map

Time thresholds of supervision on the mapBar chart: 3 seconds route refresh, 60 seconds to count a stop, 89 seconds gap that ends a stop020406080100sRoute refreshRoute refresh: 3 s3Start of a stopStart of a stop: 60 s60Gap ending a stopGap ending a stop: 89 s89
Source: Delivery route preview functions sheet

Route preview as a tool for talking to the driver

The delivery route preview on the online map shows the locator's path from the entrance to the plant up to the current moment, and the route points refresh together with the vehicle position every 3 seconds. The dispatcher can therefore see on the spot which way the driver went before calling him.

Good practice is to open the preview before asking the driver where he is. The conversation then starts from a fact: I can see you are standing at the junction, which way are you going next?

Reconstructing the route after an incident

Route points of a delivery are saved separately at every signal from the active locator, so the route can be reconstructed also for an archived delivery. This matters when explaining incidents: the driver claims he did not leave the designated road, while security sees it differently.

We recommend that the plant decides who has the right to reconstruct archived routes and for what purpose. A driver's route contains personal data, so access should be limited to security, dispatchers and the people responsible for safety. The retention period is agreed with the customer's data protection officer.

Response to a stop outside the designated spot

The system shows a stop, but a person decides what it means. A vehicle waiting in the queue to a dock is a normal situation. The same vehicle standing between warehouses with no connection to a delivery requires contact. For deliveries under special supervision the response threshold should be lower than for ordinary ones.

Good practice assumes a simple scenario: the dispatcher sees a stop, opens the route preview, checks whether the vehicle is in the queue, and if not, contacts the driver or sends a security patrol. The event is recorded in the log.

Checklist

Video

Frequently asked questions

After what time does the system treat a vehicle as stopped?

A stop is a series of readings in the same location lasting longer than 60 seconds. A gap in the signal longer than 89 seconds ends the stop.

Can the route be viewed after the delivery is over?

Yes. Route points are saved separately at every signal from the active locator, so the route can be reconstructed also for an archived delivery.

What do the vehicle colours on the map mean?

Red means navigation for a driver from abroad, black means delivery under special supervision, and white means an ordinary delivery.

See the delivery map in practice

Book a call or a demonstration. We will show how your dispatcher could watch deliveries under special supervision and react to stops.

Let's talk