Why the decision requires a procedure
The same situation, a technician at a machine, is judged differently by different people. One host will consider an inspection a visit, another will consider it work. The difference goes unnoticed until the technician starts to open a guard. A procedure in five questions removes this variation, because every answer leaves a trace.
In the InnerWeb system a planned visit is equivalent to a one-day permit, without a time of day, for people entering without work: conversations, estimates, measurements. It removes only the permit requirement. Training, qualifications and an active account still decide whether the gate admits the person. The guide helps decide when this path may be used.
Five questions from the OHS manager
The questions are asked in this order. The first affirmative answer to a question about work ends the assessment: a permit is needed, and a visit is not enough.
- Will the technician carry out any action on the machine or installation, rather than only inspect it?
- Will they open a guard, remove a safety device or connect a tool that comes into contact with the drive or the power supply?
- Will they enter an area of dangerous work, for example a confined space, height or an explosion-hazard zone?
- Will the visit last longer than one day or require a return after working hours?
- Is the person from an external company, with valid induction training and an active account?
How to read the answers
The first three questions concern the nature of the work. If the answer to any of them is yes, a permit is required. The fourth question shows that a one-day visit does not cover the need: a visit lasts one day, and each further day needs its own. The fifth question checks what a visit does not replace.
Types of questions in the five-question procedure
What the host does, and what security does
Every visit has a host who is an internal employee. On the first entry of the guest on the day of the visit, the dispatcher calls them once. This is a short conversation confirming that the guest is expected and that the host knows why they came.
Security does not decide the nature of the work. At a refusal at the gate it may set a Plant visit (today), but only when the sole gap is the permit and the person belongs to an external company. For other gaps, for example missing training, the backend returns an error and saves nothing. The decision whether it is an inspection rests with the host or the OHS manager.
Multi-day visit
A visit can be planned for several days at once. One entry covers up to 34 days, and the date cannot be more than 377 days from today; a day with an existing visit is skipped. For a periodic service that inspects the machine once a week, this is a convenient way to plan several visits in one action.
What evidence stays for the audit
For the auditor three things matter: who was the host, what decision was taken (permit or visit), and when the guest entered and left. Gate events also feed the working time records, so one entry and exit scan serves both the evacuation list and the RCP.
The system provides evidence for an audit but does not replace human judgement. If the OHS manager decided that the inspection does not require a permit, it is worth recording the reason in one sentence in the visit note. This protects both the host and the plant.
Typical mistakes
The most common mistake is treating a visit as a convenient way to avoid a permit. A visit is not a simplification of work, but a distinction: a guest who does nothing does not need a permit. The second mistake is assuming that a visit releases from training. It does not.
The third mistake is a visit set at the gate out of habit. Security has limited powers here precisely so that the decision on the nature of the work returns to the plant. It is better to plan visits in advance: then the host is known and the dispatcher knows whom to call.
Checklist
Video
Frequently asked questions
Does a service technician on an inspection need a permit?
No, if they do not carry out work and a visit is enough. Training, qualifications and an active account are still required.
Who decides whether it is work?
The host of the visit or the OHS manager. Security only sets a visit for today when the sole gap is the permit.
What about a service that lasts several days?
A visit is set for each day. One entry covers up to 34 days, and days with an existing visit are skipped by the system.
Let's set the threshold between a visit and a permit
We will go through typical service jobs with your OHS department and set which of them a visit handles and which a permit from the template.
Let's talk