Checklist for admitting a one-time service technician: five minutes before arrival

A service technician who is not on the list of partner companies arrives in ten minutes. Reception has five minutes to check the things that decide whether they enter without being stopped at the gate. Below is the checklist with a comment on each point and the situations in which one of the points ends in a refusal.

64
characters in the registration note
Source: guest registration feature card
1
day a visit is valid
Source: planned visits feature card

Why five minutes is enough

Most gate stops result from gaps that can be noticed in advance: no visit, no host, invalid training. Reception does not decide the nature of the work, but checks the completeness of the data. That is the difference between sending a service technician away from the gate and admitting them after one minute.

The checklist is deliberately short. A longer one would not be used when the next call comes to reception. Each point has one answer: yes or no, and for a no it is indicated what to do next.

Comment on the checklist items

The points below describe exactly what to check and what the system does if something is missing.

Visit or permit for today

A planned visit is equivalent to a one-day permit, without a time of day, for people entering without work: conversations, estimates, measurements. It removes only the permit requirement. If the service technician is to work, a permit is needed, not a visit. Reception checks whether one or the other exists for today.

Host

Every visit has a host who is an internal employee. Reception checks whether the host is entered and whether they are at work. On the first entry of the guest, the dispatcher will call them once, so the host should know to answer.

Training and account

A visit does not replace training. A service technician without valid induction training is directed to it at the registration station, and a refusal gives the reason, for example missing training, missing permit or visit, or an inactive account. If the service technician is not in the system, reception creates them in the registration tile.

Badge and QR code

The guest registration tile turns first and last name, plus an optional note of up to 64 characters, into an external account with a registration number and a printed QR badge, in one action. The first name can have up to 20 characters, the last name up to 30. Before arrival it is worth checking that the printer has labels.

Health declaration

The daily health declaration of the guest, required among other things by the BRCGS standard, is a function disabled by default. When enabled, a guest without today's declaration does not enter, and the entry is not recorded. Reception checks whether this function is enabled at this plant and informs the service technician in advance.

Checklist points by area

Checklist points by areaBar chart: three points on the visit and host, two each on training, badge and declaration.0123pointsVisit and host: 3 points3 pointsVisit and hostTraining and account: 2 points2 pointsTraining and accountBadge and printer: 2 points2 pointsBadge and printerDeclaration and plant: 2 points2 pointsDeclaration and plant
Source: Layout of the checklist described on this page

What to do when a point is not met

No visit and no permit: reception contacts the host or the OHS manager and does not set a visit itself. Security at the gate may set a Plant visit (today), but only when the sole gap is the permit and the person belongs to an external company.

No training: the service technician watches the film at the registration station, without manually entering the code. No host: the visit is not complete and needs supplementing before the service technician enters. No health declaration, where required: the guest completes it on site, and only then enters.

After the service technician leaves

The checklist does not end at the gate. After the visit reception checks whether the exit was recorded: a repeated scan of a person who is on site within a short time window shows a welcome, and only a scan after a break longer than the window records the exit. The window is set in seconds, and the default fallback value is 5 seconds.

The exit record matters, because gate events feed the evacuation list and the working time records. A service technician with no recorded exit stays on the list of people on site until the end of the day, which during an evacuation drill creates a false picture. That is why the last point of the reception day is reviewing people who entered but did not exit.

Checklist

Video

Frequently asked questions

Can reception set up a visit on its own?

The visit is set up by the host or a person with authority. Security sets it at the gate only when the sole gap is the permit and the person is from an external company.

Does a visit release the service technician from training?

No. A visit removes only the permit requirement. Training and an active account still decide entry.

When is a health declaration required?

When the plant has enabled this function, which is disabled by default. Then a guest without today's declaration does not enter.

Let's print the checklist for your reception

We will match the points to your plant's settings, including the health declaration and the companies for guests, and rehearse the admission of a service technician at the registration station.