Permit or visit: where the boundary lies
The boundary is set by what the visitor does after passing the gate. If they carry out work, for example replacing a component, opening a guard or connecting to an installation, they need a work permit. If they only talk, look, or measure for the purpose of an estimate and do not enter the area of works, a planned visit is enough.
In the InnerWeb system a planned visit is equivalent to a one-day permit, without a time of day. It applies to people entering without work: conversations, estimates, measurements. This is a feature described in the product documentation, not a shortcut at the gate: someone at the plant must create it in advance, or security sets it up under strictly described conditions.
Does a visit replace training or qualifications?
No. A visit removes only the permit requirement. Training, qualifications and an active account still decide whether the gate admits the person. A service technician without valid induction training will be directed to it, not let in on the strength of the visit alone.
How many days does a visit cover?
A visit covers one day. If the inspection takes two days, a separate visit is needed for each day. When planning, several days can be selected at once: one entry covers up to 34 days, and the date cannot be more than 377 days from today. A day that already has a visit is skipped by the system and no duplicate is created.
Who creates the visit and who is the host
Every visit has a host, who must be an internal employee of the plant. This is the person who receives the guest, knows why they came and is responsible for their stay on site. The host cannot be an employee of an external company, even when that company invited the technician.
On the first entry of the guest on the day of the visit, the dispatcher calls the host once, without retries. One call is enough, because its purpose is to confirm that the guest is expected, not to raise an alarm. If the host does not answer, security decides the next step according to the gate procedure.
What if the technician arrives without notice?
At a refusal at the gate, security may set a Plant visit (today), but only when the sole missing item is the permit and the person belongs to an external company. For any other gap, for example expired training or an inactive account, the system returns an error and saves nothing. Security therefore has no way to bypass the other requirements.
Limits of the planned visits module
Questions from the gate and reception
The answers below come from situations that most often stop entry. Each is based on how the visits module works, not on the good intentions of the gate guard.
The technician has a QR code, but the gate rejects it. Why?
Most often one element is missing: the permit, the training or an active account. The refusal shows the reason, so security can see whether this is a matter for the visit or for the OHS department. If training is missing, a visit will change nothing.
Can I create a visit only after a refusal at the gate?
Yes, but only through security and only in the described case. The better practice is to create the visit in advance through the host, because then the gate stops nobody, and the dispatcher has the information about the guest ready.
Can an employee of an external company be the host for their own colleague?
No. The host is an internal employee of the plant, because the plant is responsible for who is on its premises and who they are in contact with.
When a visit is not enough
A visit is not enough whenever the guest is to do something, not just look. Replacing a part, working on a machine under power, entering a confined space or working at height are tasks that require a permit. The boundary is sometimes unclear when the technician starts with an inspection and after a few minutes suggests a quick repair.
In such a case the host stops the work and asks for a permit before it starts. The simplest rule for reception is this: if the request contains the word repair, assembly or replacement, a visit is not enough. The detailed decision path is described in the guide for the OHS manager, linked below.
What stays in the records
Gate events also feed the working time records, so one entry and exit scan serves both the evacuation list and the RCP. A one-time service visit therefore leaves a trace: who was the host, when the guest entered and when they left. This is evidence for an audit, and also a simple way to answer, a week later, who looked at the machine and for what purpose.
Video
Frequently asked questions
Does a visit replace a work permit?
Only for people entering without work, for one day. A visit removes the permit requirement, but does not remove training, qualifications or the need for an active account.
Who can be the host of a visit?
Only an internal employee of the plant. The dispatcher calls them once at the guest's first entry on the day of the visit.
Can security let in a service technician without any visit?
No. Security may only set a visit for today when the sole gap is the permit and the person is from an external company. In other cases the system returns an error without saving.
How many days ahead can I plan a visit?
One entry covers up to 34 days, and the date cannot be more than 377 days from today. Days that already have a visit are skipped.
Let's look at a service visit on sample data
We will show visit planning, the host role and a gate refusal, then agree with you which jobs need a permit and which only a visit.
Let's talk