Why a woodworking hall is a demanding environment
The movement of panels, boards and pallets takes place on the same corridors used by machine operators. Dust rises during machining and settles on mirrors, cameras and cab windows, which reduces visibility at crossings. Drivers who do not know the hall join the traffic as unexpected people.
Improvement does not require rebuilding the hall. It starts with the plant knowing who is where, and with that knowledge reaching the people responsible for traffic.
Practices that organise traffic
The practices are grouped into three areas: the infrastructure of routes, knowledge of who is in the hall, and communication with suppliers.
Separated routes and handover points
Mark forklift routes separately from pedestrian crossings, and equip crossings with mirrors and signals. If a supplier does not drive into the hall, set up a handover point at the ramp where a plant employee takes over the load.
Knowing who is in the hall
The worker carries a BLE device that reports which transmitters it hears, the signal strength, the battery state and its status, and the platform knows the position. The position from the signals of several transmitters is averaged on the map, and as a guide, one transmitter per 100 to 200 m2 is assumed for a building. The dispatcher therefore sees how many people are at the ramp before the next transport arrives.
A supplier as a guest with a host
A planned visit by an external firm has a host, whom the system calls once when the person first enters. For the delivery driver the rule is simple: someone on the plant side knows that the driver has arrived and can collect him from the handover point.
Example breakdown of people in the hall during a delivery
Instruction and language
The library of documents, audio and video is assigned at every level of the plant hierarchy, with inheritance down the tree. A short instruction on forklift traffic for the hall therefore reaches everyone assigned to that hall, including external firms, without distributing files.
For drivers from outside the plant who do not speak Polish, an instruction in their own language works better than a notice on the wall. The content should concern specific places: where to wait, where not to drive in, where the assembly point is.
Evacuation and transport traffic
The evacuation list refreshes every 13 seconds and divides people into groups, including separate tabs for each external firm. In an alarm, the coordinator sees the plant staff and the delivery firms separately, and can establish whether a forklift driver has left the hall. In practice it is worth adding to the instruction that during an alarm forklifts stop at the designated places, not on the evacuation route.
InnerWeb is an independent system that complements the plant's existing systems and works without GPS, so no changes to the plant's systems are needed for these practices to work.
Checklist
Video
Frequently asked questions
Does a delivery driver need an account in the system?
A planned visit by an external firm is arranged with a host, and training, qualifications and an active account still decide whether a person may enter.
Does the system show forklifts on the map?
The system locates people carrying a BLE device. A forklift can be covered by the location of the person who drives it.
How quickly does the evacuation list show changes?
The list refreshes every 13 seconds and divides people into groups, including tabs for each external firm.
Organise traffic in the woodworking hall
We will show how the hall map, the evacuation list and the visit host support safe forklift and delivery traffic.
Let's talk