InnerWeb
Skip to main content

Georeferencing the beacon map: a guide for the GIS specialist

The position of a device on the hall plan is converted to geographic coordinates according to the georeferencing of the hall: an anchor point, rotation and scale, with a correction for the meridian convergence of the PUWG 1992 grid. Leaving out the correction shifts the point by tens of metres. This guide shows how to set these four parameters and how to check the result on a world map.

approx. 40 m
error at 3 km when the 0.77 degree correction is omitted (example)
Source: geometric calculation
3 + 1
georeferencing parameters and the PUWG 1992 grid correction
Source: card

Why georeference the hall plan

The hall plan with beacons is a drawing in a local coordinate system: positions are measured in metres from an adopted origin. A world map uses geographic coordinates. To show a worker, a vehicle or a beacon on the online map, the system converts the position from the plan to geographic coordinates according to the georeferencing of the hall.

For the GIS specialist this is a classic similarity transformation task, extended with a correction of the reference system. The parameters have to be set once per hall, but an error in them scales with the distance from the anchor point, so it is worth checking them at control points.

Three parameters of georeferencing

According to the georeferencing of the hall, the conversion is based on an anchor point, rotation and scale. The anchor point is the place on the plan to which you assign known geographic coordinates, for example a building corner measured by a surveyor. Rotation is the angle between the axes of the plan and the direction of north. Scale defines how many metres of terrain correspond to one unit of the plan.

The choice of the anchor point matters in practice. Choose a point as close as possible to the centre of the hall or of the working area, because rotation and scale errors grow linearly with the distance from it. Anchoring at the extreme corner of the whole hall doubles the maximum distance over which the error accumulates.

  • Anchor point: known coordinates for the selected point of the plan.
  • Rotation: angle relative to north, in degrees.
  • Scale: the ratio of a plan unit to a metre on the ground.

Example: position error when the 0.77 degree correction is omitted

Example: position error when the 0.77 degree correction is omittedLine chart: the position error grows from 2.7 m at 200 m to 13.4 m at 1 km and 40.3 m at 3 km from the anchor point.01020304050m200 m1,000 m3,000 m200 m: 2.7 m2.71,000 m: 13.4 m13.43,000 m: 40.3 m40.3
Source: Geometric calculation: distance multiplied by the sine of 0.77 degrees (example)

Meridian convergence correction in the PUWG 1992 grid

The fourth element is the easiest to omit. The PUWG 1992 grid (in the EPSG register under code 2180) is a projected system in which the grid north does not coincide with geographic north except along the central meridian. The difference is called meridian convergence and it has to be taken into account as a correction of rotation.

Omitting the correction shifts the point by tens of metres. This can be estimated: the meridian convergence is approximately equal to the difference of longitude from the central meridian multiplied by the sine of the latitude. For a difference of 1 degree at a latitude of about 50 degrees north this gives about 0.77 degrees. An uncorrected angle of 0.77 degrees shifts a point 3 km from the anchor by about 40 m.

The same angle gives about 13 m at a distance of 1 km and about 2.7 m at 200 m. That is why for a single hall the error may be invisible, while for an extensive plant with roads and halls kilometres apart it becomes clear.

How to check the result

After setting the parameters, determine at least three control points distributed around the perimeter of the hall or plant, including one point far from the anchor. Measure their coordinates geodetically or read them from an orthophoto map of known accuracy, and compare them with the result of the conversion.

If the error grows in one direction with the distance from the anchor, suspect rotation or an uncorrected meridian convergence. If it grows in all directions, suspect scale. If it is constant, the anchor point has been shifted.

Finally, overlay the beacons on the world map and check whether those by the road lie on the road and those by the building lie by the building. Errors of a few metres are then visible to the naked eye, and you can tell errors in the data of the beacons themselves, discussed in the pages on route jumps, from georeferencing errors: georeferencing shifts the whole network uniformly, while a wrong position of one beacon singles out only one point.

Good practice for maintaining georeferencing

Record the georeferencing parameters together with the project documentation: the coordinates of the anchor point, the angle, the scale, information about the correction applied and the date of measurement. When extending the system with a new hall, anchor it separately, instead of extending the georeferencing of the previous one.

Remember that the position on the plan is the source of truth for the beacons, and georeferencing only translates it into the map system. Correcting the georeferencing therefore changes the position on the world map, but it should not require rewriting the beacon positions on the plan.

Video

Frequently asked questions

What is the anchor point?

It is the place on the hall plan to which known geographic coordinates are assigned. Rotation and scale are calculated from it, so it is best to choose a point close to the centre of the working area.

Why is the PUWG 1992 correction needed?

The grid north of the system differs from geographic north except along the central meridian. Without the meridian convergence correction the point shifts by tens of metres.

Does a georeferencing error shift only one beacon?

No. It shifts the whole network in the same way. A wrong position of a single beacon in the database singles out only one point.

Sources

Set the plant map on a world map

Book a conversation: we will go through the georeferencing parameters of your hall and the control points to check before going live.

Let's talk