For whom and why this list
These recommendations are addressed to the administrator of the location system, who decides before installation at the plant how transmitters are marked in the database. They also concern the integrator and the person responsible for installation documentation, because they are the ones who add further devices years later.
The stakes are concrete. Two physical transmitters several hundred metres apart may broadcast an identical major:minor pair, and the system then recognises them as one transmitter. Routes start to jump, and simply moving the position in the database does not fix the error, it only moves it to the other place.
Seven recommendations
The recommendations are ordered from the most important. The first three concern uniqueness, the next ones names and spares, the last ones checks after installation.
1. Reserve a range of major numbers for each zone
Assign a range of major numbers to each zone of the plant: hall, road, yard, warehouse. This way the number itself tells you where to look for the transmitter, and two devices in different zones cannot receive the same pair by mistake.
Reserve the range with some margin. Extending a hall should not require renumbering the existing devices.
2. Minor rising within a zone, with no reuse of numbers
Assign minor numbers in sequence and do not reuse them after a transmitter is withdrawn. A replaced unit gets a new number, and the old record stays in the database as a spare. Reusing numbers is the shortest path to a duplicate, because the old device may still be mounted somewhere.
3. A transmitter register kept before installation
Before a transmitter leaves the warehouse, enter it in the register: identifier, zone, planned place, installing person. A register generated after the fact always contains gaps. Before the first installation you can also check whether any major:minor pair repeats in the import file.
4. Location name as data, not decoration
The name of a transmitter shown on the map comes from the location assigned to it, not from the transmitter itself. Name locations so that the place of installation is visible: road, section, pole number. Names such as 'Point 1' help no one who is hunting an error at two in the morning.
5. One location, one physical place
One physical navigation point may have two transmitter rows in the database with a shared minor and different majors, of which only one is detected and the other is a dormant spare. Accept such a pair knowingly and describe it in the register, so that nobody corrects the position of the row that is not the live one.
6. Do not delete inactive transmitters
Spare transmitters may start transmitting again someday, so their records stay. To tell the pair apart, a spare may receive a name with a zero appended. It is a simple convention that saves questions during diagnosis.
7. Check after installation, not only before
After installing a batch of transmitters, check on the map whether the routes of a test trip are continuous. This way duplicates surface in the first week, not after a quarter. If a problem is detected, we describe the diagnostic methods in the best practices for detecting duplicates.
Example pool of major numbers by zone (count of numbers)
Sample numbering scheme
The scheme below is an example, not a standard. Adapt it to the number of zones in the plant. We assume a plant with four zones and a reserve for expansion.
Hall zone: major 100 to 199. Road zone: major 200 to 299. Yard zone: major 300 to 399. Warehouse zone: major 400 to 499. Majors 900 to 999 are kept for test and withdrawn transmitters. Minor rises from 1 within each major, without reuse.
- Halls: 100-199
- Roads: 200-299
- Yards: 300-399
- Warehouses: 400-499
- Test and withdrawn: 900-999
Georeferencing and numbering
Numbering solves the question of identity, but the position still requires correct georeferencing of the hall. The physical position of a device is converted to geographic coordinates based on an anchor point, rotation and scale, with a correction for the meridian convergence of the PUWG 1992 system. Omitting the correction shifts the point by tens of metres.
In practice this means that two different errors produce a similar symptom. A route jump may come from a duplicate identifier or from a shifted georeference. Settling the numbering in advance narrows the field of search.
What to avoid
The most common mistakes are copying numbers from an old installation into a new one, assigning majors in the order the equipment was delivered, and describing locations with abbreviations known only to the fitter. Each of them produces either an unreadable database or a duplicate.
Making the scheme overly complicated is also unnecessary. A simple rule that the team actually follows is better than a complicated one that everyone interprets differently.
Video
Frequently asked questions
Is it enough for the major:minor pair to be unique within a zone?
No. The system recognises a transmitter by the pair alone, so it must be unique across the whole installation, including between zones and halls.
Can the numbers of withdrawn transmitters be reused?
We advise against it. The old device may still be mounted or may return to circulation, and reusing a number creates a duplicate.
How do I know what name the user sees on the map?
The name comes from the location assigned to the transmitter. That is why location names should describe the place of installation.