InnerWeb
Skip to main content

Single-visit guest exit: the evacuation list

The evacuation list is only as reliable as the last exit scan. Single-visit guests often leave without a scan: a courier drives off within a minute, a service technician walks out with his host. Below are practices that keep the list free of people who left the site long ago, and free of surprises during an evacuation drill.

5 s
default window for a repeated scan
Source: feature card
13 s
refresh interval of the evacuation list
Source: feature card
6
groups of people on the list
Source: feature card

Why a missing exit scan spoils the list

The evacuation list is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups, including guests, couriers and suppliers. The printout is one page per group. When a person enters but does not leave with a scan, they stay on the list indefinitely, and the evacuation coordinator looks at the assembly point for someone who is not in the building.

False entries have two costs: lost time in a real emergency and falling trust in the list. After a few drills in which half of the "missing" people left long ago, nobody takes the printout seriously.

Practice 1: one scan, one event

The system has a time window: a repeated scan by a person who is already on site, within the window, shows a welcome message, and only a scan after a pause longer than the window records the exit. The window is set in seconds, and the default fallback value is 5 seconds. This protects against an accidental exit from a double scan, but it also means that an exit requires a deliberate, separate scan.

Security should know that a second scan within a few seconds will not record the exit. A guest who scans twice in a row will see the welcome message and may think they have left; this has to be explained to them.

Times and groups in an evacuation

Times and groups in an evacuationThree horizontal bars: scan window 5 s, refresh 13 s, six groups.051015unitsScan window (s)Scan window (s): 5 units5List refresh (s)List refresh (s): 13 units13Groups of peopleGroups of people: 6 units6
Source: Feature cards: registration station and evacuation list

Practice 2: the exit scan as part of leaving the building

At the gate or the gatehouse, place a clear notice: "Exit scan mandatory". For single-visit guests, the host who walks the guest out is responsible for this. For couriers, the rule is given in the induction training.

The rule also applies to service technicians on a same-day visit: the host walks them out and confirms the scan. Without the walk-out the rule does not work, because the guest has no motivation to scan the exit.

Practice 3: a list review at the end of the shift

At the end of the shift, security reviews the list of people still on site. If single-visit guests remain who passed their planned time long ago, security checks them with the host or on the cameras and, if needed, closes the visit by hand, with a description in the note. The review takes a few minutes, and the list starts the next morning clean.

Gate events also feed the working time records, so one scan of entry and exit has one source for the evacuation list and for the attendance system. Taking care of guests' exit scans is therefore not a separate duty, but the same data hygiene.

Practice 4: an evacuation drill on real data

Once a year, and preferably twice, run a drill with the printed list. Count the people physically present at the assembly points and compare the count with the printout. Divide the differences into two kinds: people without an exit scan and people without an entry scan. Each group is corrected by a different organisational change.

A printout by group lets the coordinators work in parallel: one takes care of guests, a second of couriers, a third of external companies.

Practice 5: communicating with the guest at entry

The registration station is an unattended kiosk with a USB scanner: a trained person is welcomed, and an untrained one is shown the induction training, without a field for typing the code by hand. It is worth including one sentence about the exit scan in the training, because it is the last opportunity to shape the guest's behaviour.

The language the guest selects at reception decides the language of the training video and the interface; the station supports Polish, English, Russian and Ukrainian. The sentence about the exit scan should be translated together with the whole video.

Practice 6: information for the visit host

The host receives one call at the first entry, but nothing tells them about the exit. Add a rule to the instructions for hosts: whoever brought the guest in takes them out and watches for the scan. This is one line in the procedure that reduces the number of false entries on the list.

The host is a natural control point and needs no new tool.

Checklist

Video

Frequently asked questions

Will a second scan within a few seconds record the exit?

No. A repeated scan within the time window shows a welcome message; the exit is recorded only by a scan after a pause longer than the window.

Can the time window be changed?

Yes, it is set in seconds; the default fallback value is 5 seconds.

Where does the list get its data?

From QR scans at the gate; the same events feed the working time records.

Does InnerWeb replace access control readers?

No. It is an independent system that complements the client's existing systems; we do not manufacture readers.

Let's talk about one-time entries at your plant

We will show the path of a guest, a courier and a service technician on sample data and agree what the plant needs to prepare. Book a short presentation.

Let's talk