What is a BLE beacon: FAQ for the plant director

A BLE beacon is a small radio transmitter fixed permanently to a building or to a plant road, which broadcasts its own identifier several times a second. It does not read cards, open doors or track anyone on its own. Below are the answers a plant director hears first, before deciding on a location pilot.

100 m
recommended spacing of beacons on plant roads
Source: spec sheet
100-200 m²
building area per one transmitter
Source: spec sheet
16,000
beacons deployed in InnerWeb projects
Source: company data

Basics: what a beacon is

A plant director usually knows three things: the employee access card, the reader at the door and the locator tag on a forklift. A beacon is none of them, which is why the first conversation about a pilot often starts with sorting out the terms.

What exactly does a beacon do?

A beacon transmits a short Bluetooth Low Energy message carrying its own number. The device worn by the employee hears this message, measures its signal strength and sends the system information about which beacon it hears and how strongly. The beacon itself does not know the employee and stores no personal data.

Because a beacon only broadcasts its number, it is a simple and inexpensive part of the infrastructure to maintain. The knowledge of where each transmitter is mounted is kept by the system in its location database.

How is it different from an access card and a reader?

An access control reader stands in one place and records the moment a card is presented. A beacon works the other way round: the device carried by the employee listens to the transmitters and reports where it is. InnerWeb does not manufacture or replace access control readers. It receives card-swipe events from the client's existing system and links them with the other data.

Is a beacon the same as a locator tag?

No. A locator tag is a device that is carried or mounted on a moving object and receives signals. A beacon is fixed and serves as the reference point. Without several beacons, a locator has nothing to calculate its position against.

Equipment, certificates and who is responsible for what

InnerWeb is a software producer. The industrial beacon is the only hardware element we design and build ourselves: it has an industrial design registration, a CE declaration of conformity and an ATEX construction for zones 2 and 22. Active cards, multi-chargers, watches, radios, readers and kiosks are purchased from suppliers and integrated by us.

For procurement this means one thing: the contract covers the software and the beacon, while the remaining equipment can come through standard channels if the plant already has a preferred supplier.

Can a beacon be mounted in an explosive atmosphere zone?

The ATEX construction for zones 2 and 22 means the device is designed for places where an explosive atmosphere occurs rarely and for short periods. For zones 0, 1, 20 and 21, and for a specific temperature class, the decision must be taken together with the plant's Ex documentation designer. Directive 2014/34/EU sets the framework, and the assessment of the mounting location rests with the owner of the facility.

Number of beacons for a 5,000 m² hall

Number of beacons for a 5,000 m² hallBar chart: 50, 33 and 25 beacons for a 5,000 m² hall at 100, 150 and 200 m² per transmitter.01020304050pcs1 per 100 m²: 50 pcs50 pcs1 per 100 m²1 per 150 m²: 33 pcs33 pcs1 per 150 m²1 per 200 m²: 25 pcs25 pcs1 per 200 m²
Source: Illustrative calculation: 5,000 m² divided by the density from the recommendation of 100-200 m² per transmitter

How many beacons are needed and where to place them

The recommended layout is simple to remember: along plant roads about every 100 m, and inside a building one transmitter per 100-200 m². An employee's position results from the signals of several transmitters averaged on the map and works without GPS, so what matters is coverage density, not a single point.

Example calculation for a hall

For a hall of 5,000 m² at one transmitter per 100 m², the result is 50 units, and at one per 200 m² it is 25 units. This is an illustrative calculation based on the assumptions on this page. The actual number depends on racking, metal structures and the required accuracy. That is exactly why a pilot starts with measurements in one hall, not with an order for the whole plant.

Do plant roads also need coverage?

Yes, if the system is to show vehicles and pedestrians outside the buildings. With roughly 100 m between transmitters, a vehicle route is rebuilt from successive points. An incorrectly recorded beacon location then produces a sideways spike in the route, which is discussed on a separate page about route jumps.

Privacy, batteries and service

The plant director and the data protection officer most often ask about privacy. A beacon broadcasts only its own number, so it collects no data about people. Position data is created on the system side, from readings of the worn device, and is subject to access rules agreed within the plant.

The second question concerns service: who checks the transmitters and how often. The status of the system is visible on the map and in the device heartbeat, and the service procedure is agreed with the plant during the pilot.

From the question to the pilot

A sensible pilot covers one hall or one plant road, a dozen or so worn devices and clearly written criteria for assessment: position accuracy, refresh time and the number of false jumps. InnerWeb works as an independent system complementing the plant's existing systems, so the pilot does not require replacing access control or the HR system.

We have carried out 20 implementations and pilots and have 16,000 beacons deployed. Each pilot that moved on to implementation ended with a recommendation based on measurements from a specific hall.

Checklist

Video

Frequently asked questions

Does a beacon require a mains power supply?

It depends on the model and the mounting location. For each location the project gives the plant a power specification, and the battery replacement or inspection procedure is set out in the service procedure agreed during the pilot.

Does a beacon transmit continuously?

Yes, it broadcasts its identifier cyclically. The worn device decides how often it reads the signals and sends them to the system.

Is a Wi-Fi network needed across the whole plant?

Beacons do not use Wi-Fi for transmitting. The way data from worn devices is sent is set for the plant and depends on the connectivity chosen.

Will the system replace access control?

No. InnerWeb is an independent system that complements the plant's existing systems, including access control, time and attendance, HR and ERP.