Costs: How Many Beacons for a 5,000 m2 Hall

For a 5,000 m² hall, the rule of 1 beacon per 100-200 m² gives 25 to 50 beacons, and for a 1 km internal road, with spacing of about 100 m, about 10 units. Together this is a range of 35-60 transmitters to plan in the purchasing budget before field measurement refines the number.

25-50
beacons for a 5,000 m² hall
Source: przykladowa kalkulacja
10-11
beacons per 1 km of road
Source: przykladowa kalkulacja
35-60
in total to plan
Source: przykladowa kalkulacja

The rules behind the calculation

Recommended beacon placement: plant roads about every 100 m, and in a building one beacon per 100-200 m². The employee's position results from the signals of many beacons averaged on the map and works without GPS, so the number of beacons directly affects the quality of the position. The InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX version for zones 2/22, which matters if part of the hall lies in an explosion-hazard zone.

Hall of 5,000 m²: the range of beacon numbers

The calculation is simple. With a denser layout, 1 beacon per 100 m², the result is 5,000 / 100 = 50 units. With a sparser one, 1 per 200 m², the result is 5,000 / 200 = 25 units. The range for the hall is therefore 25-50 beacons.

Where you are within this range depends on the structure. A hall with high-bay racking, metal structures and numerous partitions requires a denser layout. An open hall with few obstacles usually approaches the lower limit. The decision is based on an audibility measurement, not on the formula alone.

Number of beacons: economy and dense variant

Number of beacons: economy and dense variantBars show the number of beacons for a 5,000 m2 hall and a 1 km road in the economy and dense variants01020304050pcsHall 5,000 m²: Economy variant (1 per 200 m²): 25 pcs25 pcsHall 5,000 m²: Dense variant (1 per 100 m²): 50 pcs50 pcsHall 5,000 m²Road 1 km: Economy variant (1 per 100 m): 10 pcs10 pcsRoad 1 km: Dense variant (end-of-section reserve): 11 pcs11 pcsRoad 1 km
Source: Example calculation based on the assumptions in the section Total and purchasing buffer

Internal road of 1 km

With spacing of about 100 m along 1 km of road, about 10 beacons are needed (1,000 / 100 = 10). In practice one beacon is added at the end of the section, so plan 10-11 units. At junctions and places where the direction changes, the density can be increased, because route jumps are most visible to the dispatcher there.

Total and purchasing buffer

The combined range for the hall and the road is 35-60 beacons (25 + 10 in the economy variant, 50 + 10 in the dense variant). For purchasing it is worth including a reserve for replacement and corrections after measurement. A reserve of a few percent is a reasonable planning assumption, but it is an assumption of the calculation, not a manufacturer's rule.

The equipment price is individual and depends on the execution (standard or ATEX), the quantity and the service, which is why we do not give a price per unit here. For the purchasing manager the more important point is that the dense variant doubles the number of beacons compared with the economy one, so the decision on density should be based on operational requirements.

What else affects the number

Zones 2/22 require the ATEX execution, which may limit the choice of mounting locations. A multi-storey building is counted per floor, and the 3D mode needs readings from at least 5 beacons. Battery or mains power changes the cost of maintenance, but not the number of beacons.

  • Hall area and type of structure.
  • The 3D mode requirement in selected places.
  • Explosion-hazard zones and the ATEX execution.
  • Length and geometry of internal roads.

How to confirm the number before ordering

Order a measurement at several points in the hall under real occupancy, and decide for each area whether you are closer to 1 per 100 m² or 1 per 200 m². Then order the number from the lower range plus a reserve, and add beacons after the first week of operation wherever the map shows an unstable position.

Example calculation

Number of beacons for a 5,000 m² hall and a 1 km road

Assumptions
ParameterValue
Hall area5000 m²
Density in a building1 per 100-200 m²
Length of internal road1000 m
Spacing on the roadapprox. 100 m

Result: Hall: 25-50 units. Road: 10-11 units. Total 35-60 units before measurement and reserve.

Note: Example calculation based on the layout recommendations. The actual number depends on the structure; the price of the equipment is individual.

Video

Frequently asked questions

Does the rule of 1 per 100-200 m2 apply to the whole plant?

It applies to buildings. Plant roads are calculated separately, by a spacing of about 100 m.

Do I have to buy the full number at once?

No. It is sensible to order the lower range with a reserve and add beacons after a week of operation wherever the map shows an unstable position.

Is the price given on the website?

No. The price is individual and depends on the execution and the quantity.