InnerWeb
Skip to main content

Driver voice navigation inside the plant: the most common questions

Driver voice navigation inside the plant means spoken instructions such as "turn left", "turn right", "straight on" and "turn back", played by the beacon locator app. It works without GPS and without live routing. Below are the questions the logistics director and the IT provider ask before they agree to such a system on internal roads.

10
languages of voice navigation
Source: karta
55 s
validity of a voice message
Source: karta
100 m
approximate spacing of transmitters on plant roads
Source: karta

Location questions: is GPS required

No, it is not. The driver position comes from signals of several BLE transmitters that the locator picks up on the road, and the system averages them on the plant map. Transmitters on internal roads are placed roughly every 100 m, so satellite signal is not needed. This matters under canopies, in technical tunnels and between tall warehouses, where GPS is most often wrong.

The next question is usually about junctions: does a transmitter have to stand in the middle of one. It does not. A junction is a geometric point on the map, and the message is triggered by transmitters on the approach, whose signal carries tens of metres. As a result, nothing has to be installed in the traffic lane itself. Mounting takes place on poles, canopies and building walls along the road.

The third question from IT is what happens if a single distant signal is received. A junction message is triggered by a transmitter on the approach that is confirmed in two consecutive location readings, and a single distant signal is discarded. The exception is a special point, for example a weighbridge or a tight spot at the gate. There the message plays after the first signal, because reaction speed matters most there.

Message content questions: how the system knows what to say

The basis is an editable decision matrix. For a given warehouse or plant it records what to say at which junction. There is no live routing and no routes hard-coded in the software. This is a deliberate choice: the traffic engineer at the plant knows that a truck with a trailer will not turn where a car fits, and can record that in the matrix, which a general map algorithm would not do.

The plant administrator edits the matrix in the panel. They set the direction, indicate the triggering transmitters and mark the special point. The change takes effect without a deployment and without a restart, so after a gate is closed for repairs the recommended detour can be changed within a few minutes.

The message "turn left" or "turn right" is calculated from the real approach segment of the driver relative to the stored absolute direction, so the message is correct from every arm of the junction. When the system cannot determine from which side the driver approached, it stays silent and records this in the log. A wrong direction is worse than no message.

Voice navigation parameters

Voice navigation parametersBar chart: 10 languages, 55 second message validity, 2 confirming readings, 1 junction prompt per delivery.0204060countNavigation languagesNavigation languages: 10 count10Message validity (s)Message validity (s): 55 count55Confirming readingsConfirming readings: 2 count2Junction prompts per deliveryJunction prompts per delivery: 1 count1
Source: Delivery voice navigation feature card

Language and repetition questions

Navigation works in 10 languages: Polish, Ukrainian, English, Russian, Romanian, Bulgarian, Slovak, Czech, German and Hungarian. Polish is the default. This matters for carriers from several countries, because a driver does not need to know Polish or English to hear that they should turn right.

The language is selected when the locator is issued: security records per device whether the driver wants voice navigation, in which language, and whether the delivery is under special supervision. Switching navigation off clears the selected language, and switching it on without a choice sets Polish, so there are no unclear states.

Drivers are annoyed by repetition. For this reason each junction speaks at most once during a single delivery. A driver who turns back and returns to the same junction will not hear the same instruction a second time.

Delay and network coverage questions

The voice message is sent as a push message valid for 55 seconds. If the phone does not receive it within that time, the message expires and is not played a few minutes later when the phone regains coverage. This answers the concern of the logistics director: a driver will never hear an instruction for a junction that they passed a quarter of an hour earlier.

For IT it is worth recording that mobile or Wi-Fi coverage across the plant is a condition for delivering the message, and coverage is checked before launch on the roads covered by the matrix. Places without coverage are marked as areas without navigation, instead of relying on a message that will expire.

On the question of live traffic: the system does not calculate the route in real time, so there is no delay caused by calculation. The delay is the time for two location readings and the delivery of the push message.

Supervision and operator view questions

On the online map, a vehicle with navigation in a language other than Polish is red, a vehicle under special supervision is black (it takes precedence over the other colours), and an ordinary one is white. Security can see at a glance which drivers may not understand the signs and messages in Polish.

After isolating one active delivery, the operator sees its route from the entry to the present moment and the stops longer than one minute. This is useful when a driver reports that a message came too late: the route shows exactly where they were at that moment.

The plant health and safety manager usually asks about compliance with traffic rules on plant grounds. Voice navigation supports drivers in following those rules, but it does not replace the induction training or the road markings. It is a supplement that reduces wandering and entry into restricted zones.

Video

Frequently asked questions

Does the driver need their own phone?

The messages are played by the locator app, so a device with that app and network access is needed. Navigation settings are recorded by security when the locator is issued.

Can the directions be changed after a road is closed?

Yes. The administrator edits the matrix in the panel, and the change takes effect without a deployment and without a restart.

What does the driver hear if the system cannot determine the direction of approach?

Nothing. The system stays silent and records the event in the log, because a wrong direction is worse than no message.

Can a message arrive several minutes late?

No. A message is valid for 55 seconds, and a message that is not delivered expires.

Let us talk about the roads in your plant

We will show the decision matrix on an example of a typical junction and discuss how many transmitters your internal roads need.

Let's talk