Who approves and what happens to the machine while waiting
Questions about approval come up most often, because they decide whether the line stops for ten minutes or for an hour. The answer depends on whether the service work is ordinary work or especially dangerous work, known as PSZN in Polish practice.
Can the external company approve especially dangerous work itself?
No. In InnerWeb, especially dangerous work is a separate object attached to the permit and passes through a state machine with eight states. Only a user on the plant side can approve or reject it. The external company can prepare the request, complete the data and carry out the tasks, but the decision to admit the work belongs to a person appointed by the plant. This way the manufacturer's technician, even an experienced one, does not decide on his own admission.
Can the machine stand still until the permit is approved?
The machine may and should stand still until the work is admitted, if the plant procedure says so. The system does not replace this rule with physical locking of the machine. It records who admitted the work and when. It is therefore worth writing one sentence into the plant's instructions: service work does not start before approval by the appointed person. The system provides the evidence that this moment took place and the time from which the work is counted.
PSZN status versus permit status
This difference is often misunderstood, so it is worth recording it. The status of especially dangerous work is independent of the permit status. Open PSZN tasks do not block the permit from moving from the preparation stage to the main work, or from the main work to closing. This is a business decision built into the product: the permit describes the whole service, and PSZN is a separate record of higher-risk work.
What does this mean for the production manager?
A green permit is not proof that all especially dangerous work is closed. Before accepting the machine back, the manager checks two indicators: the permit status and the status of each linked PSZN. If the plant wants to tighten this rule, it does so through its procedure and the acceptance list, not by expecting the system to block the transition.
When can a PSZN be closed?
Especially dangerous work will not close while more than one employee remains on site. This protects against closing work while someone is still inside the zone.
How the system knows what the service permit should look like
Production managers also ask whether every service requires manually drafting the permit. It does not. The course of the permit, that is the preparation tasks, the main tasks, the closing tasks and auto-closing, follows a template linked to the location and the tasks. The configuration sits in the installation's data, not in the code, so changing the order of tasks or adding a step for a machining line is a matter of settings made by an authorised person at the plant.
Can service in the assembly hall and on the machining line follow a different course?
Yes, if the plant prepares two templates and links them to the right locations. The external employee who selects the machine then gets the correct set of tasks without searching the catalogue. The closing tasks and their order are set by the plant, and the system makes sure they are ticked off.
Technician location and proof of presence
The third group of questions concerns how the plant knows that the technician is at the correct machine. The system determines the employee's position from BLE signals from beacons, without GPS. The position feeds the attendance view, the permit automation and the safety signals. In the hall we assume roughly one beacon per 100-200 m², and the position comes from averaging signals from several beacons, so it is not a reading from a single point.
Will the manager see the technician on the map?
Yes. The online plant map in the 2.5D isometric view shows the building volumes, the employees and the places of work. A permit covering several locations, for example the machine and its surrounding area, is drawn as a single outline. The manager can therefore see whether the service takes place where the permit allows it.
Is this something that works at our plant today?
The scenario described in this FAQ concerns a plant manufacturing agricultural machinery, owned by a global group, and is part of an offer and demonstration. It is an implementation scenario, not a report from a working installation, and it should be treated that way when planning.
Video
Frequently asked questions
Does approving a PSZN stop the whole permit?
No. The PSZN status is independent of the permit status, and open PSZN tasks do not block permit transitions. A plant that wants to tighten this rule does so through its procedure and the acceptance list.
Will the system stop the machine itself until approval?
No. InnerWeb is a complementary system and does not control the machine. It records who admitted the work and when. Setting the rule that work does not start earlier is the plant's rule.
Who at the plant approves PSZN?
A user on the plant side, appointed in the role configuration. The external company has no such option.
Where is the record of the technician's work?
In the permit and the linked PSZN: statuses, tasks, the permit time, and the working time of each employee, counted separately.
We will show service on your hall map
Let us arrange a conversation and a demo: we will walk through a service permit from request to acceptance on a layout close to your plant.