InnerWeb
Skip to main content

Scenario: machine manufacturer service on the assembly hall floor

A manufacturer's technician comes to an agricultural machinery plant to replace a subassembly at an assembly station. Below is his day from the perspective of the maintenance coordinator: from the template permit to closing the work. This is a concept for an M-type plant, not a description of a deployment.

100-200 m2
roughly per one transmitter in the hall
Source: card
4
types of tasks in the permit flow from the template
Source: card

Starting point: the machine, the technician and the coordinator

An agricultural machinery plant belonging to a global group has a machine on its assembly hall whose warranty service is carried out by the manufacturer. The technician is an employee of an external company. He knows the machine better than anyone at the plant, but he does not know the hall, its risks or the entry rules that apply here.

The maintenance coordinator has three questions: does the technician hold valid qualifications, was the permit issued in a form the plant accepts, and how will he know that the work actually started and ended. This scenario shows how a system in which the permit, the qualifications and the location form one workflow answers these questions.

Before the service day: a template instead of writing from scratch

The flow of the permit, meaning the preparatory, main and closing tasks and auto-closing, follows a template linked to the location and its tasks. The configuration sits in the installation data, not in the code, so the data administrator sets it up once for the place where the machine stands.

The day before, the coordinator creates the permit from a ready template for the machine's location. When the permit is created, the system checks whether the technician holds the required, valid qualifications, because qualifications, medical checks and training results of external company employees are stored in the system. A missing valid document shows up at that moment, not at the gate on the day of the work.

Risks assigned to the place

The risk catalogue is hierarchical and assigned to the location (hall, area, line, place), and the person ordering the work can add a risk ad hoc. The technician therefore gets the risks of this workstation on the printout, not a general list for the whole plant.

Sample split of a service day

Sample split of a service dayBar chart of a sample service day split: preparation 40 min, main work 240 min, closing 20 min.050100150200250minPreparation: 40 min40 minPreparationMain work: 240 min240 minMain workClosing: 20 min20 minClosing
Source: Sample calculation: service of one machine for one shift, times assumed for illustration

The service day step by step

The day has three stages: entry and joining the permit, the main work, and closing. In each of them the system takes over some of the records that a person would otherwise write on paper.

Entering the hall and joining the permit

The employee's position is determined from BLE signals from transmitters, without GPS. In the hall there is roughly one transmitter per 100-200 m2, and the position comes from averaging the signals of several transmitters. When the technician enters the place of work, the system can add him to the permit for that location, so nobody has to enter the start time by hand.

Main work

The plant closes the preparatory tasks before the technician starts the main part of the work. If during the work a need for especially dangerous work arises, it becomes a separate object attached to the permit, and only a user on the plant side can approve it. The coordinator sees on the isometric map the building volume, the place of work and the people who are in it.

Closing

When all tasks are closed and the workers have left the place of work, the system closes the tasks and the permit, provided that auto-closing is enabled in the template. The technician does not have to remember the last click, and the coordinator does not wait for a phone call saying the machine is free.

What the coordinator sees during the day

The permit time and the working time of each person are counted separately. A person's time starts from joining or from the start detected by location, so two technicians who entered at different times have two different times under one permit.

For purchasing this means billing based on actual presence. For security it means that the list of people in the service zone comes from the system, not from a sheet at the gate. The permit printout can mirror the plant's paper form through an uploaded template matrix, so the document looks familiar.

  • who is at the place of work right now
  • whether the preparatory tasks are closed
  • how long the main work took
  • whether the permit closed itself

Conclusions for an M-type plant

The biggest change in this scenario is not technology but the order of steps: the permit, the qualifications and the location are checked earlier and without manual retyping. The manufacturer's technician remains the expert on the machine, and the plant keeps control over who works where and when.

It is worth treating the scenario as a starting point for a demonstration in your own hall: one machine, one template, one permit. After such a run it is easy to judge which tasks the plant wants to close automatically and which it prefers to close by hand.

What can go differently and how to put it in the plan

The scenario assumes that the technician's qualifications are in the system and that the transmitters in the hall cover the place of work. In practice both assumptions should be checked before the first service. Missing qualifications end in a refusal to issue the permit, so the provider should hand over the data in advance, and the coordinator knows the validity dates thanks to warnings about expiring documents.

The second assumption concerns the location. Where transmitters are sparse, the boundary of the place of work can be imprecise, and the position comes from averaging the signals of several transmitters. That is why, before the demonstration in your own hall, it is worth walking around the machine with a phone and checking whether the person standing next to it is shown in the right place.

The third assumption is the role of the coordinator. The system does not replace the decision to let the technician in. It provides the information needed to make that decision and records its consequences. When a need for especially dangerous work arises during the job, a person on the plant side decides on its approval.

  • technician qualification data entered before the day of work
  • location boundary checked on the hall floor
  • named person approving especially dangerous work

Video

Frequently asked questions

Is this scenario already implemented at the plant?

No. It is a concept for an M-type plant, at the offer and demonstration stage. It describes how a service day could look using permit templates and locations.

Does the technician need a phone with the app?

The external view serves the external company to handle its tasks. The rules for issuing phones or cards to guests are set by the plant, and the details depend on the chosen configuration.

Who approves especially dangerous work during a service?

Only a user on the plant side. The external company cannot approve or reject such work.

We will show this day in your hall

Book a demonstration: one machine, one template, one service permit on the map of your plant.

Let's talk