Service work zone outline on the hall map

A machine service rarely fits in one point: it needs the machine station, the power cabinet and the control panel. When a permit covers several locations, the map draws them as one outline. Below are practices for setting this outline so that security and production see the zone closed to traffic.

1
outline for a permit covering several locations
Source: card

Why an outline and not a point

The plant's online map in the 2.5D isometric view shows building volumes, employees and places of work. A permit covering several locations is drawn as one outline, so security sees the whole service zone at once, not three scattered points.

A point on the map says where the machine stands. An outline says where a forklift must not drive, where one should not enter without a permit, and where the technician can move during the work.

How to choose the locations for the outline

The outline includes all places where the technician will physically work: the machine, its power supply and the control panel or control cabinet. The locations should match the places to which risks are assigned, because then the risks of the outline follow from its parts.

The position of an employee comes from averaging the signals of several BLE transmitters, and in a building there is roughly one transmitter per 100-200 m2. For this reason the outline's locations should not be smaller than the area the system can tell apart.

Do not draw the outline too tightly

An outline that is too tight means a person standing at the machine may be shown outside it. Leave a margin for access and for placing tools.

Do not draw the outline too widely

An outline that is too wide removes more from traffic than necessary, and production starts ignoring the map. The boundary should match the actual work zone.

Example: number of control points for the outline

Example: number of control points for the outlineBar chart: three points separately versus one outline.0123pcsThree points separately: 3 pcs3 pcsThree points separatelyOne outline: 1 pcs1 pcsOne outline
Source: Sample calculation: service with three locations (machine, power supply, panel)

What security and production read from the map

Security sees which people are inside the outline and whether the list matches the permit. Production sees that the line next to the outline is switched off, and can route transport around the zone. For the coordinator the outline is also information about when the zone returns to traffic: when the permit is closed.

When auto-closing is enabled in the template, the system closes the tasks and the permit once all tasks are closed and the workers have left the place of work, so the outline disappears from the map when the zone is free.

Agreements with the team

Before the outlines start to apply, agree with security and production a simple rule: an outline on the map means a ban on traffic unrelated to the work. Without such a rule the map remains information, not a tool. It is also good to rehearse one outline on one machine before the templates are copied across the whole hall.

Example: machine service with power supply and control panel

A machine service covers three places: the machine station, a power cabinet a dozen or so metres away, and a control panel on the wall. Without an outline security sees three unrelated points and does not know that a forklift driving the corridor between them crosses the service zone.

After drawing one outline the same corridor is marked as part of the zone closed to traffic, and the production manager chooses a detour in advance. This is a sample calculation, but it shows the sense of the method: the outline turns a list of locations into a zone that people can understand.

It is worth checking such an outline in practice. Walk the corridor with a phone and see at which point a person enters the outline. If they appear inside it too late, widen the location by the access route; if too early, narrow it.

The outline also has value for audit. After the permit is closed, the record remains of which locations were part of the zone and which people worked in it, so an auditor can reconstruct the course without verbal accounts. For repeated services it is worth keeping a reference outline for the machine and reusing it for later permits, changing only what actually differs. All numbers in the examples on this page are a sample calculation based on the assumptions given in the text, not data from a specific plant.

Checklist

Video

Frequently asked questions

Can an outline be drawn for every permit?

An outline is created for a permit covering several locations. A permit with one location is shown as a single place of work.

Does the map work in the hall without GPS?

Yes. The position is determined from BLE signals from transmitters, not from GPS.

When does the outline disappear from the map?

When the permit is closed, either manually or automatically if auto-closing is enabled in the template.