What an audit is and what it contains
An audit is a set of reports from one walkround. It has a name, a date, a hall or building, and an auditor. As a result, ten findings recorded during the same round do not scatter across a list. They form one record that can be reviewed, assigned and closed.
Reports can carry a pin on the hall plan in SVG or raster format. The audit plan shows all reports of the audit together with photo thumbnails, so the supervisor immediately sees where the problems are and what they look like. Instead of a description such as north wall by the second gate, the finding gets a point on the drawing.
How progress is calculated
Audit progress is the number of resolved and rejected reports divided by all reports in the audit. Rejected reports count as closed, because a decision to reject also ends the matter. With fifteen reports, of which nine were resolved and two rejected, progress is 11 of 15, or about 73%.
This measure is fair: it does not reward reports waiting in the queue and does not hide those that are stuck. The maintenance manager sees how much work is left, and the auditor can show management one number instead of a manually prepared summary.
- Resolved: the defect has been removed
- Rejected: the report is unjustified or a duplicate
- In progress: still requires action
- Progress = (resolved + rejected) divided by all reports
Example: status of 15 audit reports
Why status is calculated and not entered
The audit status can be open, in progress or completed. It is calculated at every read from the current reports, rather than being saved once and forgotten. As a result nobody has to remember a manual change, and the status does not drift away from the state of the reports.
A special case: a completed audit in which even one report is still in progress has the status in progress. The system therefore does not allow the record to look closed while an open defect still exists on site. This simple safeguard reduces the risk of an item being overlooked.
When the transmitter suggests a location
When a report is created, the system can suggest a location from a transmitter. It does this only if the user's last BLE reading is no older than 34 minutes and comes from the same hall as the one selected in the form. An older reading, or one from another hall, is ignored.
This gives the auditor a practical rule: start the walkround as soon as you enter the hall, not an hour later. If you have worked somewhere else for more than half an hour, the suggestion will not appear and you indicate the location with a pin on the plan. This limit protects against a wrong location taken from an outdated reading.
Audit without a 3D model
Many halls have a background plan but no building with 3D geometry yet. In that case the list of audit buildings returns the technical areas of the hall, which are not buildings. An audit can therefore be created without a 3D model and findings can be collected from the first walkround.
This lowers the entry barrier: there is no need to model the whole plant first in order to run structured walkrounds. A 3D model can be added later, and the reports collected so far stay assigned to the hall.
Video
Frequently asked questions
Can a completed audit have the status in progress?
Yes, if even one report is still in progress. The status is calculated from the current reports, so it does not hide open matters.
Does a rejected report count towards progress?
Yes. Progress is resolved plus rejected, divided by all reports in the audit.
Why does the transmitter sometimes not suggest a location?
The suggestion works only when the BLE reading is no older than 34 minutes and comes from the same hall as in the form. Otherwise the location is indicated on the plan.
Do I need a 3D model to create an audit?
No. If the hall has a background plan and no building with 3D geometry, the list of audit buildings returns the technical areas of the hall.