Before entering the hall
The walkround starts with creating the audit: its name, date, hall or building, and the auditor. As a result all reports from the round end up in one place. If the hall has a background plan but no 3D model, the audit can still be created, because the list of buildings returns the technical areas of the hall.
Check the hall plan: whether it is current, whether it covers the places to be visited, and whether the SVG or raster format is readable on a phone screen. A missing plan is the most common reason why pins are not created.
During the walkround
A report is created on site: you describe the defect, add a photo and place a pin. The transmitter suggestion fills in the location only when the last BLE reading is no older than 34 minutes and comes from the same hall as in the form. An older reading is skipped.
Practical rule: start the walkround as soon as you enter the hall and do not take breaks longer than half an hour in another place. If the suggestion does not appear, indicate the location with a pin. Do not interrupt the walkround to look for it.
Example: walkround time for 15 findings in an audit
After the walkround
The audit plan shows all reports with photo thumbnails, and progress counts resolved plus rejected, divided by all reports. The audit status is calculated at every read: open, in progress or completed.
Review the plan, decide on rejections, assign the remaining reports and set when you return to the audit. An audit that is closed but has even one report still in progress stays in the in progress status, so an open matter cannot be hidden.
Most common mistakes during a walkround
The first mistake is a break longer than half an hour in another hall. The transmitter suggestion expires after 34 minutes and applies only to the same hall as selected in the form, so after a break the location must be indicated manually. The second mistake is no photo: a finding without an image is harder for the repair crew to act on, and a thumbnail in the audit plan shortens the review.
The third mistake is creating a new audit for each report. The audit serves to group findings from one walkround, so one round is one audit. This way the progress and status show the state of the whole round, not of a single finding.
The fourth mistake is skipping rejections. A duplicate or unjustified report should be rejected, because rejected reports count towards progress. Without this the audit stays in progress for a long time, although nothing requires action.
How long a well-prepared walkround takes
In the sample calculation a walkround with 15 reports takes 60 minutes in the field (15 times 4 minutes) and 10 minutes of plan review after the walkround, a total of 70 minutes. This is an assumption, not a measurement: the time depends on the hall and the number of findings.
For comparison, a paper walkround with the same number of reports comes to about 180 minutes in the calculation, mainly because of retyping and the manual summary. The details of the assumptions are described on a separate page about the costs of a walkround.
Preparing before the walkround, that is creating the audit and checking the plan, takes a few minutes and saves a lot of time when sorting out findings.
Checklist
Video
Frequently asked questions
Does a walkround make sense without a 3D model?
Yes. The audit can be created on the background plan of the hall, and the list of buildings returns the technical areas of the hall.
Why did the transmitter not fill in the location?
The BLE reading was older than 34 minutes, or it came from a different hall than the one selected in the form.
How do I check how much work is left?
Audit progress is resolved plus rejected, divided by all reports, and the status is calculated at the time of reading.
After the walkround do I have to prepare a summary?
No. The audit plan collects the reports with photo thumbnails, and progress is calculated automatically.